Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 217.71 69.57 31.96  
1 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN , SM/18890 Augmentation Acceptance cum formal order for the work of construction of 350 M3 capacity OHR 20 Mtr staging height RCC OHR at Jemua piped W/s Scheme under DWSD,PHE Dte ORD/000353/2019-2020 1203/DWSD 06/12/2019 180 GITA CONSTRUCTION 86.64 22.71 26.21 85
2 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN , SM/18890 Augmentation Formal order for the work of construction of pump house cum chlorine room with sanitary arrangement and water supply at H/W site TW-II of cracky nature of soil according to Deptt drawing under Augmentation of Jemua PWSS under DWSD,PHE Dte ORD/000355/2019-2020 468/DWSD 02/05/2019 45 DARPAN DAS & CO. 6.67 6.61 99.1 100
3 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN , SM/18890 Augmentation Acceptance cum formal order for the work of Supplying laying and aligning of HDPE distribution and allied works including FHTC and connection providing to Paranganj mouzas JL-79 part-B under command area of Jemua Piped W/s Scheme under DWSD, PHE Dte. JUNIOR ENGINEER-1 ORD/000004/2023-2024 584/DWSD 11/04/2023 30 M/S UNIQUE 31.10 11.45 36.82 80
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN , SM/18890 Augmentation Acceptance cum work order for Additional work for Jemua Water Supply Scheme at Gopalpur within Durgapur Faridpur Block under RCFA Division-I PHE Dte. Assistant Engineer 3 ORD/000019/2024-2025 1522/RCD-I 14/06/2024 45 ASHA CONSTRUCTION 22.23 0.00 0 0
5 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN , SM/18890 Augmentation Rising main along with interconnection of both pump house -1 and 2 supply laying distribution system at Jemua mouza of Aug of Jemua PWSS under DWSD ,PHE Dte ORD/000356/2019-2020 1204/DWSD 16/12/2019 90 ASHA CONSTRUCTION 71.07 28.80 40.52 78
Total 217.71 69.57 31.95