Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 162.17 58.39 36.01  
1 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distribution pipe line and providing FHTC at Garkilla-Kherobari,Gourangapur(28) mouzas of Garkilla-Kherobari piped W/s Scheme under DWSD, PHE Dte under DWSD, PHE Dte (Part-A ,B & C) (SL-5) ORD/000167/2022-2023 764/DWSD 13/05/2022 45 BABA LOKENATH ENTERPRISE 28.84 2.15 7.45 100
2 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Formal order for the work of Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Garkilla -Kherobari (JL-27),Gourangapur(JL-28) mouzas of Garkilla-Kherobari piped W/S scheme under DWSD,PHE Dte ORD/000022/2023-2024 735/DWSD 15/05/2023 60 BABA LOKENATH ENTERPRISE 104.15 51.61 49.55 85
3 PASCHIM BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Garkilla Khorobari Water Supply Scheme of Paschim Bardhaman under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000922/2022-2023 1222/CMD 16/03/2023 30 SOUVIK HALDER 10.21 4.11 40.25 70
4 PASCHIM BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Supply & Delivery of Pump Motor Set at TW No: 01 of Garkilla Khorobari water supply scheme under CMD, PHE, Driller In-Charge Junior Engineer ORD/001166/2023-2024 110/DIC/BMSD(D) 04/10/2023 15 SOUVIK HALDER 0.52 0.52 100 100
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Acceptance cum Work Order for Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Garkillah- Kherobari PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months. Assistant Engineer 3 Junior Engineer,Junior Engineer 6 ORD/001025/2023-2024 690/RCD-I 29/02/2024 180 BABA LOKNATH ENTERPRISE 1.64 0.00 0 0
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/15659 Augmentation Acceptance cum work order for Interconnection of Pipe line from main distribution pipeline to Sarada Pally under Kanksa Zone II Part D of R.C.F.A Div-I, P.H.E Dte. Assistant Engineer 3 ORD/000142/2024-2025 2246/RCD-I 11/09/2024 30 RANAJOY ENTERPRISE 16.81 0.00 0 0
Total 162.15 58.39 36.01