Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 240.36 127.29 52.96  
1 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Material Requisition To Resource Division RTOR000002/2023-2024 694/DWSd 08/05/2023 Resource Division 21.35 0.00 0 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New New service connection charges for jatgoria piped W/s Scheme BILL/00082/2023-2024 BP-2023-24-54 08/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 8.22 0.00 0 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New New service connection charges for jatgoria water supply scheme TW-2 BILL/00083/2023-2024 BP-2023-24-55 08/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.17 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Jatgoria piped W/s Scheme under DWSD ,PHE Dte(SL-07) ORD/000229/2022-2023 1254/DWSD 23/08/2022 15 RANJIB GHATAK 14.75 14.03 95.12 100
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Material Requisition To Resource Division RTOR000010/2022-2023 255/E/DWSD 15/02/2023 Resource Division 3.88 0.00 0 0
6 PASCHIM BARDHAMAN Kanksa Central Mechanical JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Jatgaria Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. Driller In-Charge Junior Engineer ORD/000010/2023-2024 1655/CMD 06/04/2023 30 CHOUDHURY ENTERPRISE 21.07 15.26 72.43 40
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the Executive Engineer, DWSD,PHE Dte ADDA Administrative building 2nd Floor, EPIP Complex, Banskopa,DGP-12 (w.e.f 18.02.2024 to 29.02.2024). (SL-02) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000314/2023-2024 186/DWSD 15/02/2024 12 PRAMIT CHATTERJEE 0.05 0.00 0 100
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division JATGARIA PIPED WATER SUPPLY SCHEME. , SM/11933 New Formal order for the work laying distribution system rising main ,construction of 100M3 reservoir with 20mtr staging height including soil investigation construction of pump house (5.40X3.60 m) with sanitary and water supply arrangement and construction of pump house (3.6 X 3.00 m) for Jatgoria W/s Scheme ,Kanksa block under DWSD,PHE Dte (NS) ORD/000269/2022-2023 1656/DWSD 05/12/2022 360 SUPER SKILL 170.87 98.00 57.35 45
Total 240.38 127.29 52.95