Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
35 1,324.55 1,031.25 77.86  
1 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Molandighi (Tube well no ¿III) sites under Bistupur piped W/S scheme under DWSD,PHE Dte (SL-21) ORD/000334/2021-2022 1810/DWSD 29/12/2021 45 DARPAN DAS & CO. 4.67 3.59 76.87 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of Sinking of 1 No (300X200 mm) dia tube well 120 mtr deep by DR rig method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well no 3 site of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte (SL-02) ORD/000257/2021-2022 1679/DWSD 01/12/2021 25 SK. ALIM 9.32 6.70 71.89 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Fomal order for the work of Supplying laying and alinging of UPVC distribution pipe line (distribution system Part-B) and allied works including FHTC and connecrtion provided to Kuldiha,Pathardihi,Keshabpur moluzas under command area of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte ORD/000353/2021-2022 148/DWSD 07/02/2022 30 TARA CONSTRUCTION 147.47 139.68 94.72 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Molandighi (Tube well no ¿II) sites under Bistupur piped W/S scheme under DWSD,PHE Dte ORD/000332/2021-2022 1808/DWSD 29/12/2021 45 CHATTERJEE CONSTRUCTION 4.67 3.59 76.87 0
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of Laying and aligning of DI K9 Rising main pipe line supplying of DI Specials and valves and other allied works under Command area of Bistupur piped W/s Scheme under DWSD PHE Dte (SL-12) ORD/000109/2022-2023 749/DWSD 10/05/2022 20 MAK CONSTRUCTION CO. 17.52 14.97 85.45 0
6 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Supplying laying and aligning of UPVC distributing pipe line and allied works including FHTC and connection providing Kuldiha(JL-53),Pathardiha(JL-52) ,Keshbpur(JL-66) Mouzas under command area of Bistupur distribution system (Part-B) of Bistupur piped W/S Scheme under DWSD,PHE Dte. (SL-03) ORD/000128/2022-2023 815/DWSD 21/05/2022 25 TARA CONSTRUCTION 54.66 42.36 77.5 0
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Sanitary arrangement and plumbing works at Molandighi H/W site Pump house No-3 Tube well No-03 for Bistupur pipe W/S Scheme under DWSD,PHE Dte (SL-06) ORD/000199/2022-2023 1061/DWSD 08/07/2022 25 DARPAN DAS & CO. 4.82 3.02 62.66 0
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of supplying and laying of 150 mm dia MS water carrying pipe with making necessary bend and others allied works at node point -414,323 and 540 near Kuldiha boys club ,Kuldiha More bus stand and Kuldiha bordoba More, Kanksa Block under Bistupur piped W/S Scheme under DWSD,PHE Dte. (SL-04) ORD/000260/2022-2023 1577/DWSD 02/11/2022 15 TARA CONSTRUCTION 37.40 33.92 90.7 0
9 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Bistupur Head work sites (Tube well no ¿I) under Bistupur piped W/S scheme under DWSD,PHE Dte (SL-18) ORD/000331/2021-2022 1805/DWSD 28/12/2021 45 BABA LOKENATH ENTERPRISE 4.87 4.20 86.24 0
10 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Continuation order for the work of soil investigation for determining the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC Elevated At Molandighi Reservoir site of Bistupur W/s Scheme under DWSD,PHE Dte ORD/000467/2021-2022 303/DWSD 10/03/2022 25 MABCO CONSULTANT 1.20 1.20 100 0
11 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Additional work for laying and aligning of DI K9 rising main pipe line and supplying DI specials ,valves & allied works under command area of Bistupur piped W/S Scheme under DWSD ,PHE Dte (Sl-06) ORD/000133/2022-2023 820/DWSD 23/05/2022 15 MAK CONSTRUCTION CO. 39.46 39.53 100.18 0
12 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Additional work for supplying laying and aligning of UPVC distribution pipe line and allied works including FHTC and connection providing to Akandara (JL-47) ,Molandighi (JL-48),Kandarakona (JL-51),Rakhitpur (JL-42) ,Chua(JL-43),Bhagaabanpur (JL-45),Hariki(JL-50) Mouzas under command area of Bistupur distributin system (Part-A) of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-02) ORD/000127/2022-2023 814/DWSD 21/05/2022 25 MRITYUNJOY MUKHERJEE AND CO 71.11 44.60 62.72 0
13 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of temporary approach road at Molandighi H/W site of Bistupur piped W/s Scheme under DWSD ,PHE Dte (SL-05) ORD/000141/2022-2023 962/DWSD 17/06/2022 10 MACHINO TECHNO 4.11 4.09 99.51 0
14 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Land development at Molandighi H/W site & back filling of Bistupur H/W site of Bistupur piped W/s Scheme under DWSD ,PHE Dte (SL-06) ORD/000142/2022-2023 963/DWSD 17/06/2022 10 MRITYUNJOY MUKHERJEE AND CO 4.15 4.17 100.48 0
15 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of 2 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-C) by modern trenchless technology through Jack pushing method at node point of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-09) ORD/000176/2022-2023 1123/DWSD 22/07/2022 25 SK. ALIM 12.44 12.44 100 0
16 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of 3 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-A) by modern trenchless technology through Jack pushing method at node point1 to 2 & 64 of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-10) ORD/000177/2022-2023 1110/DWSD 19/07/2022 25 MACHINO TECHNO 18.64 18.64 100 0
17 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of 2 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-B) by modern trenchless technology through Jack pushing method at node point-414 to 402 of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-11) ORD/000178/2022-2023 1164/DWSD 01/08/2022 25 TARA CONSTRUCTION 12.43 12.43 100 0
18 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of 1 No road crossing of distribution pipe line under Bistupur distribution main (Part-B) by modern trenchless technology through Jack Pushing method at node point 540 of Bistupur piped W/S Scheme under DWSD,PHE Dte.(SL-01) ORD/000170/2022-2023 1163/DWSD 01/08/2022 25 TARA CONSTRUCTION 6.21 6.21 100 0
19 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Quotation for Bistupur Pump house no -03 VCH/000224/2022-2023 BP-2022-23-96 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.62 0.00 0 0
20 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Quatation for Bistupur Pump house no -02 VCH/000223/2022-2023 BP-2022-23-95 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 15.76 0.00 0 0
21 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Quotation for Bistupur Pamp House No 1 VCH/000761/2021-2022 BP-2021-22-207 15/03/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.76 0.00 0 0
22 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of Supplying, laying and aligning of UPVC distribution pipe line (Distribution system( Part-B) and allied works including functional house holds tap connection (FHTC) and connection providing to Saraswatiganj (JL No-49) ,Bistupur (JL No-44) Mouzas under command area of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-03) ORD/000355/2021-2022 150/DWSD 07/02/2022 30 SK. ALIM 188.51 186.94 99.17 0
23 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Additional work for supplying laying and aligning of UPVC distribution pipe line and allied works including FHTC and connecting providing to Saraswatiganj (JL-49) ,Bistupur(JL-44) Mouzas under command area of Bistupur distribution system (Part-B) under Bistupur W/s Scheme (SL-01) ORD/000126/2022-2023 813/DWSD 21/05/2022 25 SK. ABDUL HALIM 76.67 72.69 94.81 0
24 PASCHIM BARDHAMAN Kanksa Central Mechanical Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 2 of Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000003/2022-2023 734/CMD 29/04/2022 30 MAHADEV ENTERPRISE 9.95 9.73 97.79 0
25 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of boundary wall at Madhabmat H/W site (PH No-2,TW No-2) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000521/2022-2023 336/DWSD 20/02/2023 20 GHOSH & ROY ENTERPRISE 18.36 15.74 85.73 0
26 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of Construction of boundary wall at Ghatakdanga H/W site (PH No-3,TW No-3) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000523/2022-2023 286/A/DWSD 16/02/2023 30 DARPAN DAS & CO. 12.08 0.00 0 0
27 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work of rising main & distribution system of Gopalpur Piped W/s Scheme under DWSD, PHE Dte ORD/000371/2021-2022 66/DWSD 19/01/2022 15 EXECUTIVE ENGINEER , RESOURCES DIVISION, PHE DTE. 8.89 80.89 909.9 0
28 PASCHIM BARDHAMAN Kanksa Central Mechanical Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Supply & Installation of Submersible Pumping Machinery , Voltage stabilizer , Chlorinator and Internal House wiring for Tube well No. 1 of Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim Bardhaman. ORD/000724/2021-2022 478/CMD 28/03/2022 30 C.M. ENTERPRISE 9.74 9.56 98.15 0
29 PASCHIM BARDHAMAN Kanksa Central Mechanical Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Supply & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorination Sistem and Internal House wiring for Tube well No. 3 at Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000018/2022-2023 913/CMD 31/05/2022 30 ASHUTOSH DAS & CO. 9.96 9.69 97.29 0
30 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Material Requisition To Resource Division RTOR000004/2021-2022 1816/DWSD 30/12/2021 0 Resource Division 20.35 0.00 0 0
31 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Material Requisition To Resource Division RTOR000006/2021-2022 66/DWSD 19/01/2022 0 Resource Division 80.94 0.00 0 0
32 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Material Requisition To Resource Division RTOR000003/2021-2022 1752/DWSD 16/12/2021 0 Resource Division 1.27 0.00 0 0
33 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of Sinking of 2 Nos (300X200 mm) dia tube well 120 mtr deep by DR rig method using PVC pipe and fiber glass reinforced epoxy resin slotted at tube well No-01 & 02) Molandighi of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte (SL-03) ORD/000258/2021-2022 1676/DWSD 30/11/2021 35 M/S. D. PALIT & CO. 18.62 11.91 63.96 100
34 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Formal order for the work of Supplying, laying & aligning of UPVC distribution pipe line (Distribution system Part-A) and allied works including functional house holds tap connection (FHTC) and connection providing to Akandara(JL No-47) ,Molandighi(JL No-48),Kandarakona (JL_51),Rakhitpur(JL-42,Chua(JL-43),Bhagaabanpur(JL-45),Hariki(JL No-50) Mouzas under command area of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-01) ORD/000354/2021-2022 149/DWSD 07/02/2022 65 MACHINO TECHNO 377.24 232.69 61.68 100
35 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Bistupur Piped Water Supply Scheme under Durgapur W/S Division PHE Dte. , SM/08877 New Acceptance cum formal order for the work-Construction of boundary wall at Saraswatiganj H/W site (PH No-2,TW No-2) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000522/2022-2023 337/DWSD 20/02/2023 30 CHATTERJEE CONSTRUCTION 10.68 6.07 56.84 100
Total 1,324.54 1,031.24 77.86