Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 701.68 416.01 59.29  
1 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Acceptance cum Work Order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-18) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. (Sl No. 32) Assistant Engineer 2 Junior Engineer ORD/000914/2022-2023 1176/RCD-1 24/03/2023 90 GOPAL CONSTRUCTION 4.61 0.00 0 0
2 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Acceptance cum work order for Additional works of extra cutting Laterate/sand stone of distribution network for RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Zone-18) Assistant Engineer 2 Junior Engineer ORD/000466/2023-2024 2872/RCD-1 06/10/2023 90 SWATI CORPORATION 21.83 21.48 98.4 100
3 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Material Requisition To Resource Division RTOR000037/2023-2024 2937/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0 0
4 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-18) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000557/2022-2023 3351/RCDI 23/12/2022 7 MOYTEC 0.49 0.49 100 100
5 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Acceptance cum work order for Additional works of concrete dismantling & re concreting with other allied works at distribution networks including additional laying of pipe line for RCFA Part-II Piped Water Supply Scheme under RCFA Div-I PHE Dte. (Zone-18) Assistant Engineer 2 Junior Engineer ORD/000493/2023-2024 2885/RCD-1 06/10/2023 30 SWATI CORPORATION 73.24 60.80 83.01 100
6 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Acceptance cum work order for Construction of Godown for stacking of Cholorine at Searsole Head Work site of Augmentation PWSS Of RCFA Part-II (Zone-18) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000980/2023-2024 466/RCD-1 12/02/2024 90 M/S MONDAL ENTERPRISE 9.50 9.27 97.58 100
7 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Formal work order for distribution network for RCFA Part-II Piped water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-18) Assistant Engineer 2,Assistant Engineer 3 Junior Engineer,Junior Engineer 12 ORD/000816/2022-2023 998/RCDI 22/03/2023 1016 SWATI CORPORATION 454.37 284.71 62.66 100
8 PASCHIM BARDHAMAN RCFA Division -I Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. , SM/12220 Augmentation Formal work order for Construction of 450 cum capacity 20 mtr. staging height RCC Over Head Reservoir (Pipe connection and cost of pipes. specials at Raniganj Block (Zone-18) for Augmentation of RCFA Part-II piped Water Supply Scheme under RCFA Division-I PHe Dte. in the District of Paschim Bardhaman. Ref Drawing No. PC-I/OHR/04/2022 (Sheet No. 1 & 2) Assistant Engineer 2 Junior Engineer ORD/000154/2023-2024 1901/RCD-I 09/06/2023 366 SRI KRISHNA ENTERPRISE 130.86 39.26 30 20
Total 701.67 416.00 59.29