Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
29 776.81 449.66 57.89  
1 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation New Connection at Jamgram Water Supply Scheme. BILL/00170/2022-2023 BP-2022-23-28 31/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.68 0.00 0 0
2 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for laying of HDPE Pipe line from Panuria Bazar to Shirikhad Para under Jamgram Panuria W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000646/2022-2023 344/RCD I 30/01/2023 15 SHREE DURGA ENTERPRISE 1.35 1.34 99.26 0
3 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Preparation of DPR for Augumentation of Jamgram Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte.(sl no 03) Assistant Engineer 1 Junior Engineer ORD/000481/2021-2022 2347/RCD I 17/12/2021 15 STEELCONC AND ASSOCIATES 2.88 2.88 100 0
4 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE Dte. (Part-C) Assistant Engineer 1 Junior Engineer ORD/000098/2022-2023 1271/RCD-I 02/06/2022 90 ALOKESH BANERJEE 23.92 23.08 96.49 80
5 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-D) Assistant Engineer 1 Junior Engineer ORD/000099/2022-2023 1272/RCD-I 02/06/2022 90 B.T.M CONCERN 55.19 55.16 99.95 80
6 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-B) Assistant Engineer 1 Junior Engineer ORD/000097/2022-2023 1270/RCD-I 02/06/2022 90 M/S S.K. ENTERPRISE 24.81 23.46 94.56 80
7 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme including FHTC work Block Barabani, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. (Part-A) Assistant Engineer 2 Junior Engineer ORD/000960/2022-2023 1053/RCD-I 23/03/2023 30 SRI KRISHNA ENTERPRISE 90.22 34.13 37.83 55
8 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Emergency Repairing of 750 mm dia Rising main with supply of leak repairing clamp and allied works related to supply of CI/DI specials etc, under Augmentation of Itapara Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000412/2023-2024 2612/RCD-I 12/09/2023 20 MAKALI ENGINEERING CORPORATION 98.81 98.81 100 100
9 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order Ground Level Reservoir of capacity 105 cum for Augmentation Jamgram & its Adjoining Mouza Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000835/2022-2023 1062/RCD-I 23/03/2023 180 SUBHADEEP DAS 12.25 11.43 93.31 50
10 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order Additional work for Distribution Network including adopting trench less technology at two places under Augmentation of Jamgram Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000216/2023-2024 2223/RCD-I 17/07/2023 30 B.T.M CONCERN 39.15 35.84 91.55 92
11 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Material Requisition To Resource Division RTOR000010/2022-2023 2350/RCD-I 28/09/2022 Resource Division 12.32 0.00 0 0
12 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Construction of 200 cum capacity 20 mtr. Staging height RCC Over Head Reservoir (pipe connection and cost of pipes, speciials at jamgram Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. Assistant Engineer 1 Junior Engineer ORD/000006/2023-2024 1403 RCD I 12/04/2023 360 SRI KRISHNA ENTERPRISE 72.48 57.98 79.99 90
13 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order Sinking of 4 (Four) nos river bed tube wells including collecting main & other allied works at Unionpara H/W under RCFA Part-II at Damodar river under Unionpara Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000349/2023-2024 2483/RCD-I 23/08/2023 30 T.R. ENTERPRISE 11.42 11.08 97.02 100
14 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order Construction of Boundary wall including land development, approach road (Length-65 mtr) and drain (length-160 mtr) at Jamgram OHR site of Augmentation of Jamgram Piped Water Supply Scheme under Barabani Block under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000346/2023-2024 2479/RCD-I 23/08/2023 30 SRI KRISHNA ENTERPRISE 36.83 0.00 0 5
15 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Construction of Pump House at Jamgram for Augmentation of Jamgarm Piped Water Supply Scheme under RCFA, Division-I, PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000570/2022-2023 3279/RCDI 20/12/2022 45 R B ENTERPRISE 20.73 14.00 67.53 90
16 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir of Jamuria Block for Augmentation of Jamuria Rural-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000525/2022-2023 3138/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.27 49.09 100
17 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum Work Order for Laying of different dia HDPE pipeline Including other allied works at Khorabor, Rashunpur, Amuliya under Barabani Block of Jamgram Panuria PWSS under RCFA Div- I, PHE Dte. Junior Engineer ORD/001112/2023-2024 918/RCD-I 15/03/2024 45 M/S B.K. CONSTRUCTION 15.73 0.00 0 0
18 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Supply, delivery & installation of Pumping Machineries and other Electro-Mechanical equipment at Jamgram Piped Water Supply Scheme under Asansol Mechanical Division, P.H.E Dte. Block- Barabani, District-Paschim Bardhaman. Assistant Engineer-I Junior Engineer-5 ORD/000411/2022-2023 360/AMD 09/02/2023 90 INDUSTRIAL ELECTRICAL CORPORATION 46.39 28.18 60.75 95
19 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Additional work like Horizonal Augar boring, dismantaling concrete and allied works in releted to part-B of Augmentation of jamgram PWSS under RCFA division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000642/2023-2024 3394/RCD-I 23/11/2023 7 M/S S.K. ENTERPRISE 0.80 0.40 50 100
20 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Additional work for laying 110 mm dia HDPE pipe with construction of piller for crossing a water body within Jamgram PWSS Part-C under Augmentation of Jamgram PWSS under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000674/2023-2024 3458/RCD-1 24/11/2023 15 ALOKESH BANERJEE 3.39 1.26 37.17 100
21 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Supply & installation of Sub-Mersible Pumping Machinery at RBTWs No-4, 5 and 6 of Ajoy at Jamgram Piped Water Supply Scheme, Block-Barabani, Dist.-Paschim Bardhaman. Assistant Engineer-I Junior Engineer-5 ORD/000527/2023-2024 287/AMD 20/02/2024 45 INDUSTRIAL ELECTRICAL CORPORATION 8.40 0.00 0 72
22 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum Work Order for Construction of Switch room and balance work of approach road towards Gourbazar Head Works Site under Augmentation of Jamgram PWSS under RCFA Division-I PHE Dte Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/001115/2023-2024 921/RCD-I 15/03/2024 60 R B ENTERPRISE 8.42 4.13 49.05 100
23 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum Work Order for Balance work of Laying distribution system within distribution network for Augmentation of Jamgram PWSS under RCFA Div- I, PHE Dte. (Part-D) Assistant Engineer 1 Junior Engineer ORD/001121/2023-2024 927/RCD-I 15/03/2024 45 B.T.M. CONCERN 35.23 13.38 37.98 89
24 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-III) under RCFA Div-I, PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000606/2022-2023 3274/RCDI 20/12/2022 30 M/S S.K. ENTERPRISE 22.96 5.14 22.39 50
25 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-I) under RCFA Div-I, PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000404/2022-2023 2519/RCDI 20/10/2022 30 MAA ENTERPRISE 22.60 5.52 24.42 60
26 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-I) under RCFA Div-I, PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000405/2022-2023 2520/RCDI 20/10/2022 30 B.T.M CONCERN 50.77 11.03 21.73 65
27 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house with yard lighting arrangement and other allied works at Gourbazar Pump House under Augmentation of Jamgram Piped Water Supply Scheme. Assistant Engineer-I Junior Engineer-5 ORD/000134/2024-2025 1319/AMD 21/08/2024 45 INDUSTRIAL ELECTRICAL CORPORATION 2.79 0.00 0 0
28 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for Additional by constructing pillar for water body crossing including adopting trench less technology (e.g. Jack Pushing Method etc) at Three nos location including MS work and allied works related to rising main of Itapara and adjoining mouzas under Augmentation of Jamgram Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/001062/2023-2024 502/RCD-I 12/02/2024 25 DURGA DAS MONDAL 38.11 0.09 0.24 60
29 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Jamgram Piped Water Supply Scheme. , SM/10643 Augmentation Acceptance cum work order for rising Main for Augmentation of Jamgram Piped Water Supply Scheme at Baraboni Block Under RCFA - Div - I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000569/2022-2023 3278/RCD I 20/12/2022 21 DEBI PRASAD MAJI 15.63 11.07 70.83 100
Total 776.80 449.67 57.89