Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 719.62 574.13 79.78  
1 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Detailed Route Survey, Design Drawing & DPR Preparation for Ondal (Phase-I) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) Assistant Engineer 2 Junior Engineer ORD/000535/2021-2022 501/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.91 3.91 100 0
2 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Material Requisition To Resource Division RTOR000017/2022-2023 3132 09/12/2022 0 Resource Division 40.44 0.00 0 0
3 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for Sinking of 5 (five) nos. 200 mm dia river bed tube well in river Damodar including laying of collecting main (HDPE & MS) of Augmentation of Ondal (Phase-I & Phase-II) piped Water Supply Scheme under RCFA Division-I PHE Dte.(SL NO 6) Assistant Engineer 2 Junior Engineer ORD/000112/2022-2023 1287/RCD I 03/06/2022 30 DAS & CHAKRABORTY 75.11 36.68 48.84 100
4 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for additional work cutting hard rock,boulder concrete and others work including filling earth, removal rubbish of Augmentation of Ondal Phase-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000307/2023-2024 2382/RCD-I 07/08/2023 30 M/S UNIT CONSTRUCTION 89.75 81.28 90.56 100
5 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Supply fitting fixing different dia valve and allied works in connection with laying distribution system including FHTC of Ondal Phase-I Water Supply Scheme (Part-B) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000338/2023-2024 2465/RCD-I 18/08/2023 30 AMAR CONSTRUCTION 0.62 0.62 100 100
6 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Material Requisition To Resource Division RTOR000006/2022-2023 2346/RCD-I 28/09/2022 0 Resource Division 30.80 0.00 0 0
7 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Distribution Network for Augmentation of Ondal Phase-1 Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-C) Assistant Engineer 2 Junior Engineer ORD/000297/2022-2023 2452/RCD-I 13/10/2022 180 M/S PIONEER CONSTRUCTION 307.62 304.88 99.11 100
8 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for Additional for Distribution Network for Augmentation of Ondal (Phase-I) Piped Water Supply Scheme (Part-C) Block Andal, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000233/2023-2024 2215/RCD-I 17/07/2023 30 M/S UNIT CONSTRUCTION 30.80 30.73 99.77 100
9 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Lowering of Submersible Pumping machineries in the Newly sunk River Bed Tube Well No-11,12,13,14 & 15 and other allied works at Ramprasadpur HeadWorks Site under Andal Water Supply Scheme. Assistant Engineer-I Junior Engineer-3 ORD/000650/2023-2024 554/AMD 14/03/2024 30 EASTERN INDIA SALES AND SERVICE 6.62 6.58 99.4 100
10 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for Distribution Network for Augmentation of Ondal Phase-I Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-A) Assistant Engineer 2 Junior Engineer ORD/000122/2022-2023 1608/RCD-I 06/07/2022 1057 AMAR CONSTRUCTION 53.68 31.30 58.31 100
11 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for Emergency repairing and maintenance work of damaged RCC Elevated Reservoir including of capacity 700cum at Ramprasadpur of Augmentation of Ondal Phase-I W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000763/2022-2023 390/RCD I 30/01/2023 60 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 12.78 12.62 98.75 100
12 PASCHIM BARDHAMAN RCFA Division -I Augmentation of Ondal (Phase-I) Water Supply Scheme , SM/10641 Augmentation Acceptance cum work order for Distribution Network for Augmentation of Ondal Phase-I Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-B) Assistant Engineer 2 Junior Engineer ORD/000123/2022-2023 1609/RCD-I 06/07/2022 90 UMA ENTERPRISE 67.49 65.53 97.1 100
Total 719.62 574.12 79.78