Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
23 1,172.21 597.1 50.94  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Preparation of DPR for Augmentation of Panuria Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000449/2021-2022 2345/RCD-I 17/12/2021 15 STEELCONC AND ASSOCIATES 3.02 3.02 100 0
2 PASCHIM BARDHAMAN Asansol Mechanical AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation QUOTATION MONEY FOR NEW CONNECTION AT PANURIA BILL/00026/2023-2024 BP-2023-24-7 19/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.17 0.00 0 0
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for new pipe line of 200 mm, 90 mm and 75 mm dia at Panuria Bazar under Panuria GP under Augmentation of Panuria Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000576/2022-2023 3285/RCD I 20/12/2022 60 SRI KRISHNA ENTERPRISE 12.15 12.08 99.42 0
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for Repairing and renovation of existing culvert, Pump House, Staff Quarter under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 24) Assistant Engineer 1 Junior Engineer ORD/000891/2022-2023 1167/RCD I 24/03/2023 90 R B ENTERPRISE 5.94 5.88 98.99 0
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Bhtas more, ardanga more on Asansol Runakuraghat Road, including supply of MS pipe and left out laying of HDPE pipe at Gourandi Bazar and allied works under Augmentation of Panuria PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000224/2023-2024 2227/RCD-I 17/07/2023 30 GITA CONSTRUCTION 43.42 39.50 90.97 91
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Tematha Panuria Bazar, Gourandi Bazar, Aliganj Road including supply of MS pipe and left out laying of HDPE pipe at Gourandi Bazar and allied works under Augmentation of Panuria PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000222/2023-2024 2226/RCD-I 17/07/2023 30 A. CONSTRUCTION CO. 30.14 29.86 99.07 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Formal Work Order for Distribution System at Katapahari, Alipur, Baradanga village and surrounding area (Part-B) under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000585/2021-2022 598/RCD-I 07/03/2022 60 GITA CONSTRUCTION 78.27 70.11 89.57 91
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for Providing FHTC work at Baradanga, Alipur and Kanta Pahari Villages under Augmentation of Panuria Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000240/2022-2023 2015/RCD-I 26/08/2022 45 GITA CONSTRUCTION 44.01 24.63 55.96 5
9 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - I (Dendua OHR Site) under RCFA Division-I PHE Dte. (Part - A) Assistant Engineer 1 Junior Engineer ORD/000013/2022-2023 1038/RCD-I 10/05/2022 180 ASHA CONSTRUCTION 147.65 26.38 17.87 87
10 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for construction of C.W.R. (Clear water Reservoir) of capacity 200 Cu.m & allied Work at Panuria under Augmentation of Panuria Piped Water Supply Scheme under RCFA Divn.-I. P.H.E. Dte. Assistant Engineer 2 Junior Engineer ORD/000594/2022-2023 3276/RCDI 20/12/2022 90 SAMIR KUMAR ROY CHOWDHURY 22.05 20.65 93.65 70
11 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptence cum work order for Laying of different dia distribution pipe line and etc. work at Tanti para, Camp para, Sasan para etc. under Khandra area under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000405/2023-2024 2587/RCD-I 07/09/2023 15 D.S.ENTERPRISE 7.48 7.42 99.2 100
12 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-B) Assistant Engineer 1 Junior Engineer ORD/000125/2022-2023 1611/RCD-I 06/07/2022 90 UNITED CONSTRUCTION 55.84 10.08 18.05 20
13 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Material Requisition To Resource Division RTOR000013/2021-2022 696/RCD-I 23/03/2022 Resource Division 92.44 0.00 0 0
14 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Material Requisition To Resource Division RTOR000007/2022-2023 2347/RCD-I 28/09/2022 Resource Division 21.56 0.00 0 0
15 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Plumbing works, sanitary fitting, flooring and other allied works of staff Quarter (Group A Type) and other allied works at Kalyaneswari township under RCFA Division-I PHE Dte.(Sl no 03) Assistant Engineer 2 Junior Engineer ORD/000018/2022-2023 1077/RCDI 13/05/2022 30 R B ENTERPRISE 3.89 1.91 49.1 100
16 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Formal work order for construction of 350 cum capacity 20 mtr staging height RCC over Head Reservoir (Piped connection and cost of pipes, specials at Gourandi H/W site for Augmentation of Panuria Piped Water Supply Scheme under RCFA Div-I, PHE dte in the District of Pachim Bardhaman. Assistant Engineer 1 Junior Engineer ORD/000618/2022-2023 102/RCD I 20/01/2023 210 A. CONSTRUCTION CO. 115.99 110.19 95 100
17 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order Proposed Pump House including Toilet of Augmentation Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000836/2022-2023 1064/RCD-I 23/03/2023 180 RUBY CONSTRUCTION 31.13 15.56 49.98 100
18 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Material Requisition To Resource Division RTOR000002/2024-2025 1179/RCD-I 03/04/2024 Resource Division 37.47 0.00 0 0
19 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum Work Order for Construction of road at Runakuraghat H/W site including earth filling,treeguard making including repairing and restoration of rising main including collecting main under Augmentation of Panuria PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000006/2024-2025 1432/RCD-I 06/06/2024 45 SRI KRISHNA ENTERPRISE 58.57 28.87 49.29 100
20 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Formal Work Order for Distribution System at Panuria village at surrounding area (Part-C) under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000586/2021-2022 599/RCD-I 07/03/2022 60 A. CONSTRUCTION CO. 76.15 72.69 95.46 100
21 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order for Distribution System surrounding OHR near Panuria under Agumentation of Panuria PWSS under RCFA Division-I PHE Dte. Assistant Engineer 1 Junior Engineer ORD/000242/2022-2023 2151/RCD-I 02/09/2022 30 A. CONSTRUCTION CO. 28.88 19.80 68.56 100
22 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Acceptance cum work order Providing FHTC work at Panuria (Part) and adjacent Habitation under Augmentation of Panuria Water Supply Scheme under RCFA Div-I, PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000295/2022-2023 2468/RCDI 14/10/2022 45 A. CONSTRUCTION CO. 69.99 38.09 54.42 100
23 PASCHIM BARDHAMAN Asansol Mechanical AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME , SM/10165 Augmentation Providing and Installation of Electro-Mechanical Equipments and Allied Works at Panuria under Augmentation of Panuria Itapara Water Supply Scheme, Block-Baraboni, Dist.-Paschim Bardhaman. Assistant Engineer-I Junior Engineer-3 ORD/000433/2022-2023 488/AMD 22/02/2023 360 BENGAL CONSTRUCTION 180.00 60.38 33.54 68
Total 1,172.20 597.09 50.94