Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 1,408.43 0 0  
1 KALIMPONG Gorubathan Neorakhola W/S & Mtc.Div. DALINGKOT FOREST & DALINGMA KHASMAHAL PWSS , SM/19112 New Material Requisition To Resource Division RTOR000125/2023-2024 41/NKWSMD 09/01/2024 Resource Division 4.82 0.00 0 0
2 KALIMPONG Gorubathan Neorakhola W/S & Mtc.Div. DALINGKOT FOREST & DALINGMA KHASMAHAL PWSS , SM/19112 New Supply and erection of scheme information board made of 50X50X6 mm. M.S. angle frame 6¿00¿X4¿00¿ size at a height over 1.5M. over ground including ties and bracing made of 32X32X6 mm. M.S. Angle and legs(50X50X6mm) are embedded at a depth of 600 mm. and to be fixed in Cement Concrete (1:2:4) footing size 250X250X600 mm underground. The board for display to be made on latex venyle print as per standard format given from department to be pasted over M.S. sheet (size-6¿X4¿) including carriage, loading, unloading at different sites for different JJM works under Neorakhola W/S & Mtc. Division, P.H.E. Dte. Assistant Engineer II Junior Engineer III ORD/000259/2023-2024 157/AE-II/NKWSMD 10/01/2024 15 SANTOSH TAMANG 14.76 0.00 0 100
3 KALIMPONG Gorubathan Neorakhola W/S & Mtc.Div. DALINGKOT FOREST & DALINGMA KHASMAHAL PWSS , SM/19112 New DALINGKOT FOREST PIPED WATER SUPPLY SCHEME SPRING WATER SUPPLY SCHEME, UNDER BLOCK:- GORUBATHAN. DISTRICT:- KALIMPONG. ORD/000250/2023-2024 4/NKWSMD 03/01/2024 365 THUPDEN BHUTIA 1,388.85 0.00 0 7
Total 1,408.44 0.00 0