Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 21,497.44 72.79 0.34  
1 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Material Requisition To Resource Division RTOR000345/2022-2023 3010/TD 27/02/2023 0 Resource Division 16.31 0.00 0 0
2 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Pump House, Laying distribution pipe line & Accommodate FHTC (50 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte. (PART-B) Assistant Engineer Junior Engineer ORD/000839/2022-2023 3183/TD 10/03/2023 180 BADAL CHANDRA GOLE 18.58 12.06 64.91 70
3 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Laying distribution pipe line, Boundary Wall & Accommodate FHTC (40 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.(PART- C) Assistant Engineer Junior Engineer ORD/000259/2023-2024 540/TD 12/05/2023 750 CHANDA AGENCIES 19.28 7.04 36.51 60
4 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Material Requisition To Resource Division RTOR000187/2023-2024 636/W 20/02/2024 0 Resource Division 0.92 0.00 0 0
5 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Quotation bill of WBSEDCL for New Service Connection at Tube Well No.-1 of Garbar Water Supply Scheme under Tamluk Division, PHE Dte. BILL/02147/2023-2024 BP-2023-24-995 20/03/2024 0 WBSEDCL 5.56 0.00 0 0
6 PURBA MEDINIPUR Bhagawanpur-II Midnapore Mechanical GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Quotation Bill for New Service connection at T/W NO-II Of GARABAR W/S Scheme under MMD, PHE, Dte. Block- Bhagwanpur-II, MADHAKHALI C.C.C. Ref. Memo No- 2004601950/QUOT/03 DT. 15-02-2024 Application NO- 2004601950 Application type-New connection Reference Id- 204217839 BILL/04265/2023-2024 01/03/2024 0 WBSEDCL 6.61 0.00 0 0
7 PURBA MEDINIPUR Bhagawanpur-II Midnapore Mechanical GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Quotation Bill for New Service connection at T/W NO-I Of GARABAR W/S Scheme under MMD, PHE, Dte. Block- BHAGWANPUR-II, MADHAKHALI C.C.C. Ref. Memo No- 2004625653/QUOT/03 DT. 01-03-2024 Application NO- 2004625653 Application type-New connection Consumer Id- 204232821 BILL/04339/2023-2024 06/03/2024 0 WBSEDCL 5.56 0.00 0 0
8 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Payment of WBSEDCL for Quotation money for New Service Connection at Tube Well No. - II of Garbar Water Supply Scheme under Tamluk Division, PHE Dte. BILL/00336/2024-2025 BP-2024-25-113 10/05/2024 0 WBSEDCL 6.61 0.00 0 0
9 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Laying distribution pipe line & Accommodate FHTC (40 Nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.(PART- D) Assistant Engineer Junior Engineer ORD/000126/2023-2024 262/TD 19/04/2023 15 PARTHA CONSTRUCTION 9.59 6.69 69.76 70
10 PURBA MEDINIPUR Bhagawanpur-II Central Drilling GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 47.00 0.22 11
11 PURBA MEDINIPUR Bhagawanpur-II Tamluk Division GARABAR PIPED WATER SUPPLY SCHEME. , SM/15850 New Pump House ,50 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation & Accommodate FHTC (20 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.(PART-A) Assistant Engineer Junior Engineer ORD/000527/2023-2024 1776/TD 02/08/2023 180 SUSIL KUMAR HAZRA 68.66 0.00 0 35
Total 21,497.46 72.79 0.34