Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 515.56 4.94 0.96  
1 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Astichak Water Supply Scheme (Zone-I) under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000856/2021-2022 1472/TD 03/01/2022 20 APEX ENGINEERING 3.99 3.99 100 100
2 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Material Requisition To Resource Division RTOR000044/2023-2024 2078/TD 28/08/2023 0 Resource Division 24.42 0.00 0 0
3 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Material Requisition To Resource Division RTOR000106/2023-2024 3009/TD 29/11/2023 0 Resource Division 7.95 0.00 0 0
4 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Astichak (Zone-I) PWSS Egra II Block under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/001981/2022-2023 889/W/MMD 27/03/2023 180 M.D.ENTERPRISE 23.65 0.00 0 0
5 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Preparation of design based on soil test report and submission of drawing of foundation for construction of 300 cum RCC OHR at Astichak Zone-I PWSS at Egra-II Block under Tamluk Division,PHE Dte. Assistant Engineer Junior Engineer ORD/001048/2023-2024 378/TD 29/01/2024 10 ASTER CONSULTANCY 0.95 0.95 100 100
6 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Quotation Bill for New Service connection at T/W NO-II, ZONE-I Of ASTICHAK W/S Scheme under MMD, PHE, Dte. Block- EGRA-II, WBSEDCL SUPPLY OFFICE: BALIGHAI C.C.C. Ref. Memo No- 2004671988/QUOT/03/47 DT. 05-04-2024 Application NO- 2004671988 Application type-New connection Consumer Id- 204266732 BILL/00502/2024-2025 BP-2024-25-91 24/04/2024 0 WBSEDCL 7.72 0.00 0 0
7 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-I) PWSS , SM/15462 Augmentation Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC (291 nos) under JJM with allied work for ASTICHAK (ZONE-I) PWSS within Egra-II Block including supply of all labour & materials under Digha Sub-Division of Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000635/2023-2024 2444/TD 19/09/2023 804 HALDIA DEVELOPMENT CONSTRUCTION 446.88 0.00 0 55
Total 515.56 4.94 0.96