Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 692.76 422.51 60.99  
1 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Astichak Water Supply Scheme (Zone-II) under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000858/2021-2022 1471/TD 03/01/2022 20 APEX ENGINEERING 4.75 4.75 100 100
2 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Material Requisition To Resource Division RTOR000041/2023-2024 2079/TD 28/08/2023 0 Resource Division 49.99 0.00 0 0
3 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Material Requisition To Resource Division RTOR000104/2023-2024 3007/TD 29/11/2023 0 Resource Division 13.53 0.00 0 0
4 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Quotation Bill for New Service connection at T/W NO-III Of ASTICHAK ZII W/S Scheme under MMD, PHE, Dte. Block- EGRA II, WBSEDCL SUPPLY OFFICE: BALIGHAIC.C.C. Ref. Memo No- 2004749715/QUOT/03 DT. 05-06-2024 Application NO- 2004749715 Application type-New connection Consumer Id- 204317619 BILL/01229/2024-2025 BP-2024-25-299 18/06/2024 0 WBSEDCL 5.53 0.00 0 0
5 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Astichak (Zone-II) PWSS Egra II Block under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/001982/2022-2023 890/W/MMD 27/03/2023 857 M/S B.M. ELECTRICAL 23.70 15.94 67.26 40
6 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Proposed Rising main and interconnection with OHR of ASTICHAK (Z-II ) & its adjoining moujas Water Supply Scheme within Egra-II Dev. Block under Digha Sub-Division of Tamluk Division, P.H.E.Dte. Dist. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000834/2023-2024 3326/TD 27/12/2023 699 ONKAR ENTERPRISE 515.99 401.82 77.87 98
7 PURBA MEDINIPUR Tamluk Division Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Drum sheet piling work, Canal Crossing Structure for Distribution pipe line, Supply and delivery of different dia D.I. specials, Repairing & renovation of OHR (350 CUM), Repairing & renovation of existing H/W site Pump House & 2nd TW site Pump house with allied works under JJM for Augmentation of Astichak Zone-II Water Supply Scheme within Egra-II Block under Digha Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur. ORD/000640/2024-2025 852/TD 19/03/2025 40 ONKAR ENTERPRISE 78.51 0.00 0 0
8 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Supply delivery & laying of 25sq mm AL. armored cable at Pump House No-I of Astichak Zone-II water supply scheme under Medinipur Mechanical Division P.H.E Dte. in the District of Purba Medinipur. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/000256/2025-2026 586/HESD 19/06/2025 7 SOUMEN ELECTRIC 0.19 0.00 0 0
9 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Astichak (Zone-II) PWSS , SM/15035 Augmentation Making of Tube Well Foundation & others at Pump House no. III & IV of Astichak, Zone-II piped water supply scheme under Medinipur Mechanical Division P.H.E Dte. in the District of Purba Medinipur. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/000265/2025-2026 603/HESD 19/06/2025 7 M/S B.M. ELECTRICAL 0.57 0.00 0 0
Total 692.75 422.50 60.99