Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
14 | 671.88 | 386.84 | 57.58 | ||||||||||||||
1 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Augmentation of ground water based Kalindi Water Supply Scheme by providing Laying of Distribution pipe line and FHTC work and Construction of R.C.C. Over Head Reservoir of capacity 450 cum and staging height 20.00 mtr. with allied work including Sub Soil Investigation within Ramnagar-II Dev. Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. | Assistant Engineer | Junior Engineer | ORD/000605/2021-2022 | 2185/TD | 17/03/2022 | 180 | BASANTA KUMAR MAITY | 533.41 | 355.97 | 66.73 | 50 | |
2 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Renovation & Repairing of existing pump house I & II, Boundary Wall at head works & 2nd tube well site of Kalindi Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. | Assistant Engineer | ORD/000372/2024-2025 | 3401/TD | 28/10/2024 | 40 | DAS ENTERPRISE. | 9.65 | 0.00 | 0 | 0 | ||
3 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Valve operator (one no) in head work site at kalindi & its adjoining mouzas water supply scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division PHE Dte. (For 12 months or 365 days) w.e.f from 10.08.2024. | ORD/000225/2024-2025 | 791/DSD | 02/08/2024 | 365 | ABHIJIT BERA | 2.14 | 0.00 | 0 | 0 | |||
4 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme under Tamluk Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000172/2021-2022 | 1181/TD | 02/12/2021 | 20 | HORIZEN | 6.91 | 5.92 | 85.67 | 100 | |
5 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Supply of 80 mm.dia C.I D.F sluice valve for laying distribution & rising main pipe line of Kalindi W/S Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. | Assistant Engineer | Junior Engineer | ORD/000371/2022-2023 | 1049/TD | 17/08/2022 | 7 | BASANTA KUMAR MAITY | 4.72 | 4.72 | 100 | 100 | |
6 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Supply & delevary of 100 mm,200mm,150mm & 250mm dia C.I D.F sluice valve for laying distribution & rising main pipe line of Kalindi W/S Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. | Assistant Engineer | Junior Engineer | ORD/000445/2022-2023 | 1155/TD | 31/08/2022 | 7 | BASANTA KUMAR MAITY | 4.28 | 4.28 | 100 | 100 | |
7 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Laying Rising Main Pipe Line With allied Works For Augmentation Of KALINDI Water Supply Scheme In Ramnagar-II Block Of Purba Medinipur District | Assistant Engineer | Junior Engineer | ORD/000872/2022-2023 | 3223/TD | 14/03/2023 | 20 | ABHIJIT BERA | 6.86 | 0.00 | 0 | 100 | |
8 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Laying of Distribution pipe line by UPVC pipes with allied works for complete balance FHTC under Kalindi & its adjoining mouzas W/S Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur district. | Assistant Engineer | Junior Engineer | ORD/000468/2023-2024 | 1449/TD | 13/07/2023 | 30 | BASANTA KUMAR MAITY | 24.44 | 0.00 | 0 | 100 | |
9 | PURBA MEDINIPUR | Central Drilling | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 240 mtrs. Depth) by utilising Departmental machineries for Kalindi W/S Scheme(TW-I), Ramnagar-II block under Purba medinipur District, CDD PHE Dte. | Driller In Charge | Junior Engineer | ORD/000016/2023-2024 | 857/CDD | 10/07/2023 | 30 | MENAKA ENTERPRISE | 18.74 | 14.63 | 78.07 | 100 | |
10 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Supply of 125 mm.dia C.I D.F sluice valve for laying distribution & rising main pipe line of Kalindi W/S Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. | Assistant Engineer | Junior Engineer | ORD/000211/2022-2023 | 323/DSD | 15/07/2022 | 7 | BASANTA KUMAR MAITY | 1.32 | 1.32 | 100 | 100 | |
11 | PURBA MEDINIPUR | Central Drilling | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Providing drilling crews Including Allied Materials for construction of Tube Well at Kalindi within Ramnagar-II Block, District Purba Medinipur under Central Drilling Division, P.H.E. Dte. | Driller In Charge | Junior Engineer | ORD/000125/2023-2024 | 1536/CDD | 06/10/2023 | 180 | MENAKA ENTERPRISE | 8.73 | 0.00 | 0 | 100 | |
12 | PURBA MEDINIPUR | Central Drilling | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Resistivity Survey and other works of Kalindi WS Scheme (TW-Il) , Ramnagar-ll Block under Purba Midnapore District, Central Drilling Division, P.H.E. Dte. | Driller In Charge | Junior Engineer | ORD/000512/2022-2023 | 1540/CDD | 08/12/2022 | 480 | MENAKA ENTERPRISE | 12.67 | 0.00 | 0 | 100 | |
13 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Material Requisition To Resource Division | RTOR000018/2021-2022 | 1260/TD | 13/12/2021 | Resource Division | 21.19 | 0.00 | 0 | 0 | ||||
14 | PURBA MEDINIPUR | Tamluk Division | Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme. , SM/09278 | Augmentation | Material Requisition To Resource Division | RTOR000051/2021-2022 | 2348/TD | 31/03/2022 | Resource Division | 16.82 | 0.00 | 0 | 0 | ||||
Total | 671.86 | 386.83 | 57.58 |