Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 1,305.81 505.73 38.73  
1 PASCHIM MEDINIPUR Midnapore Division Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Design with allied works in connection with the Functional Household Tap Connection of existing PWSS (Daspur, Block - Daspur-I) to be Augmentation / Rejuvenation under Midnapore Division, PHE Dte. AE Ghatal Sub-division ORD/000197/2021-2022 930/MD 14/06/2021 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 2.07 2.07 100 100
2 PASCHIM MEDINIPUR Midnapore Division Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Conducting of Route Survey in connection with the Functional Household Tap Connection of existing PWSS (Daspur, Block - Daspur-I) to be Augmentation / Rejuvenation under Midnapore Division, PHE Dte. AE Ghatal Sub-division ORD/000156/2021-2022 914/MD 10/06/2021 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.88 3.88 100 100
3 PASCHIM MEDINIPUR Midnapore Division Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Material Requisition To Resource Division RTOR000021/2024-2025 3339/MD 25/11/2024 0 Resource Division 117.64 0.00 0 0
4 PASCHIM MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation QUOTATION MONEY FOR DASPUR AUGMENTATION, DIHIBALIHARPUR WATER SUPPLY SCHEME, T W NO IV , JJM WORKS, SCHEME CODE SM/18506, APPLICATION NO 2004809572, REFERENCE ID 204352799, DASPUR CCC, WBSEDCL BILL/01636/2024-2025 BP-2024-25-488 30/07/2024 0 WBSEDCL 6.23 0.00 0 0
5 PASCHIM MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation QUOTATION MONEY FOR DASPUR WATER SUPPLY SCHEME, T W NO 3, [ AUGMENTATION ] , JJM WORKS, BLOCK- DASPUR-I, SCHEME CODE SM/18506, APPLICATION NO 2004849405, REFERENCE ID 204373191, DASPUR CCC, WBSEDCL BILL/02042/2024-2025 C082441593739 29/08/2024 0 WBSEDCL 5.20 0.00 0 0
6 PASCHIM MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur.under JJM Program under MMD PHE Dte. Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division- ORD/000363/2023-2024 1691/W/MMD 04/08/2023 702 P.K.ENGINEERING 37.87 26.42 69.76 100
7 PASCHIM MEDINIPUR Midnapore Division Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,245 Nos.) under JJM with allied work for Augmentation of Daspur (Zone-I & Zone-II) & its adjoining mouzas W/S Scheme in Daspur- I Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. AE Ghatal Sub-division JE RWS Ghatal Sub-Division(Daspur-I) ORD/000250/2023-2024 3145/MD 29/08/2023 761 GOBINDA MAITY 1,112.86 473.36 42.54 20
8 PASCHIM MEDINIPUR Midnapore Division Augmentation of Ground Water Based Piped Water Supply Scheme for Daspur to Accommodate FHTC, Block - Daspur-I, Dist.- Paschim Medinipur. , SM/18506 Augmentation Laying of rising main pipeline for Augmentation of Daspur (Zone-I & II) & its adj. mouzas Pipe W/S Scheme within block - Daspur-I, District - Paschim Medinipur under Midnapore Division, PHE Dte. AE Ghatal Sub-division JE RWS Ghatal Sub-Division(Daspur-I) ORD/000379/2024-2025 54/MD 07/01/2025 60 GOBINDA MAITY 20.06 0.00 0 80
Total 1,305.81 505.73 38.73