Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 23,863.26 207.23 0.87  
1 PASCHIM MEDINIPUR Narayangarh Midnapore Division GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Rendering consultancy services for Geotechnical Investigation and Report preparation of OHR locations under Narayangarh Block of Paschim Medinipur District through Jadavpur University. [Name of PWSS :- (1) Raipur (JL.- 452, Plot-926), (2) Asti (JL.- 706, Plot-496/850), (3) Babalpur (JL.- 350, Plot-876/906), (4) Bahurupa (JL.- 268, Plot-2137), (5) Barakalanki (JL.- 508, Plot-838/1168), (6) Bargopal (JL.- 480, Plot-228/620), (7) Duria (JL.- 583, Plot-686/1639), (8) Gahira (JL.- 727, Plot-1275/1539), (9) Gama (JL.- 545, Plot-532), (10) Govindapur Brahman Saran (JL.- 254, Plot-531/538), (11) Jamuna (JL.- 223, Plot-203), (12) Khursi (JL.- 601, Plot-701/942), (13) Pakurseni (JL.- 520, Plot-608/687), (14) Shuja (JL.- 403, Plot-111/751) & (15) Tutranga (JL.- 671, Plot-897) AE/RWS Midnapore Sub Division ORD/000597/2022-2023 396/MD 02/02/2023 90 JADAVPUR UNIVERSITY 71.69 4.78 6.67 94
2 PASCHIM MEDINIPUR Narayangarh Midnapore Division GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Material Requisition To Resource Division RTOR000095/2022-2023 184/MD 16/01/2023 0 Resource Division 14.27 0.00 0 0
3 PASCHIM MEDINIPUR Narayangarh Midnapore Division GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Sinking of Tube Well, Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Pump House, Boundary Wall & Providing Functional Household Tap Connection (16,427 Nos.) including 2 years operation & maintenance for BABALPUR, BAHURUPA, BARAKALANKI, GAMA & GANUA Pipe Water Supply Scheme within Narayangarh Block under Kharagpur Sub-Division of Midnapore Division PHE Dte. under Paschim Medinipur District. AE Kharagpur Sub-division,Assistant Engineer (HQ) JE2 Kharagpur Sub Division ORD/000238/2023-2024 3047/MD 23/08/2023 888 NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED 2,411.31 189.33 7.85 25
4 PASCHIM MEDINIPUR Narayangarh Midnapore Division GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Material Requisition To Resource Division RTOR000113/2024-2025 3449/MD 25/11/2024 0 Resource Division 12.04 0.00 0 0
5 PASCHIM MEDINIPUR Narayangarh Midnapore Mechanical GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Quotation for new power connection at gama PWSS T/W - I under Narayangarh block , application no - 2004739405 , ref no - 204309707 BILL/01123/2024-2025 BP-2024-25-232 04/06/2024 0 WBSEDCL 3.32 0.00 0 0
6 PASCHIM MEDINIPUR Narayangarh Midnapore Mechanical GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Quotation for new power connection at gama PWSS T/W - II under Narayangarh block , application no - 2004739453 , ref no - 204309708 BILL/01078/2024-2025 BP-2024-25-231 04/06/2024 0 WBSEDCL 3.54 0.00 0 0
7 PASCHIM MEDINIPUR Narayangarh Central Drilling GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 13.12 0.06 11
8 PASCHIM MEDINIPUR Narayangarh Midnapore Mechanical GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Supply delivery and installation of kit kat fuse carrier for different water supply scheme under Narayangarh Block and others under Midnapore Mechanical Sub Division-I,P.H.E.Dte. Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division ORD/000368/2024-2025 1087/MMSD-I 06/08/2024 15 SOUMEN ELECTRIC 6.62 0.00 0 50
9 PASCHIM MEDINIPUR Narayangarh Midnapore Division GAMA AND ADJOINING MOUJAS PWSS , SM/13083 New Continuation Work Order for "Hiring of 1 (One) Motor Cab (Standard) commercial with Catalytic Converter attachment with Bharat Stage as per prevalent application standard compliant new/not older than 30 (thirty) months from the date of 1st registration on daily hire rate basis for 06 (Six) months only having contract carriage permit for plying within West Bengal from the Regional Transport Authority for the use of the Assistant Engineer (H/Q), Midnapore Division, P.H.E. Dte. for the period of 05 (Five) months from 01.06.2025 to 31.10.2025." Assistant Engineer (HQ) Junior Engineer (estimating section) ORD/000218/2025-2026 1231/AE/HQ/MD 27/05/2025 150 NAFISA ENTERPRISE 0.71 0.00 0 0
Total 23,863.26 207.22 0.87