Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 39,373.79 37.58 0.1  
1 PASCHIM MEDINIPUR Dantan-II Midnapore Division BRAHMAN KHALISA & ADJOINING MOUZAS , SM/13051 New Material Requisition To Resource Division RTOR000082/2023-2024 1296/MD 28/04/2023 0 Resource Division 23.21 0.00 0 0
2 PASCHIM MEDINIPUR Dantan-II Midnapore Mechanical BRAHMAN KHALISA & ADJOINING MOUZAS , SM/13051 New ELECTRIC QUOTATION BILL FOR TW NO-I OF BRAHMAN KHALISA PWSS. REF CONSUMER ID-204373748, APPLICATION NO-2004853061, APPLICATION TYPE-NEW CONNECTION, NAME OF CCC-KHAKURDA CCC, NAME OF BLOCK-DANTAN-II BILL/02014/2024-2025 C082430150750 20/08/2024 0 WBSEDCL 3.48 0.00 0 0
3 PASCHIM MEDINIPUR Dantan-II Midnapore Mechanical BRAHMAN KHALISA & ADJOINING MOUZAS , SM/13051 New ELECTRIC QUOTATION BILL FOR TW NO-II OF BRAHMAN KHALISA PWSS. REF CONSUMER ID-204373752, APPLICATION NO-2004853092, APPLICATION TYPE-NEW CONNECTION, NAME OF CCC-KHAKURDA CCC, NAME OF BLOCK-DANTAN-II BILL/02015/2024-2025 C082430136142 20/08/2024 0 WBSEDCL 3.87 0.00 0 0
4 PASCHIM MEDINIPUR Dantan-II Central Drilling BRAHMAN KHALISA & ADJOINING MOUZAS , SM/13051 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 21.22 0.1 11
5 PASCHIM MEDINIPUR Dantan-II Midnapore Division BRAHMAN KHALISA & ADJOINING MOUZAS , SM/13051 New Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Providing Functional Household Tap Connection (72023 Nos.) for 41 Nos. PWSS within DANTAN-I, DANTANII & KESHIARY Block Pipe Water Supply Scheme under Kharagpur Sub-Division of Midnapore Division PHE Dte. under Paschim Medinipur District. AE Kharagpur Sub-division,Assistant Engineer (HQ) JE RWS Midnapur Sub-Division(Dantan-II),JE RWS Kharagpur Sub-Division( Keshiary),JE RWS Midnapur Sub-Division( Dantan-I),JE2 Kharagpur Sub Division ORD/000277/2023-2024 5056/MD 26/10/2023 882 ENGINEERING PROJECTS (INDIA) LIMITED 18,003.47 16.36 0.09 30
Total 39,373.79 37.58 0.1