Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 222.62 14.22 6.39  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Material Requisition To Resource Division RTOR000171/2023-2024 295/SWD-I 25/04/2023 Resource Division 31.37 0.00 0 0
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Construction of Pump House cum Chlorine Room, Boundary Wall along with Laying Distribution System, Rising Main and providing FHTC for Augmentation of Piped W/S Scheme of KALYANPUR (KHODAR BAZAR) (PART-II) of BARUIPUR Block of Surface Water based W/S Scheme in the Arsenic affected areas of South 24-Parganas District under South 24-Pgns. W/S Division-I, PHE Dte. [No. of FHTC = 1180] [TSM/018149] AE BSD ORD/000174/2023-2024 971/SWD-I 08/06/2023 90 APORUPA CONSTRUCTION 151.88 0.00 0 0
3 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 &2 of Kalayanpur ( Khodar Bazar) Part-II water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000059/2023-2024 1053/SMD 18/04/2023 90 M/S. S.S. ENTERPRISE 21.77 0.00 0 0
4 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Supply & installation of LED board at PH No.-1 of Kalyanpur (Part-II) & Piyali Kolaghata w/s scheme under South 24-Pgs Mechanical Division PHE Dte. ORD/000891/2023-2024 1070/SMSD 17/08/2023 10 SHRI KRISHNA ENTERPRISE 0.78 0.78 100 100
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Preparation and submission of Detailed Project Report of KALYANPUR (KHODAR BAZAR) , PART-II Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. ORD/000505/2021-2022 1904/SWD-I 27/01/2022 30 RADIANT 2.62 1.24 47.33 100
6 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Kalyanpur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000529/2022-2023 442/SMD 17/02/2023 90 RSA ENTERPRISE 13.01 12.20 93.77 65
7 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Supply & Fixing main switch & Bus bar at Pump House no-1 of Kalyanpur W/S Scheme under SMD, P.H.E. Dte.(Block-Baruipur) Assistant Engineer Junior Engineer ORD/002688/2023-2024 1106/SMSD 22/08/2023 15 RSA ENTERPRISE 0.29 0.00 0 0
8 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KALYANPUR (KHODAR BAZAR) PART-II piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 2 , SM/15776 Augmentation Improvement of outdoor Illumination arrangement with allied works at Pump House no-1 of Kalyanpur W/S Scheme under SMD, P.H.E. Dte. (Block-Baruipur) Assistant Engineer Junior Engineer ORD/002689/2023-2024 1105/SMSD 22/08/2023 15 RSA ENTERPRISE 0.90 0.00 0 0
Total 222.62 14.22 6.39