Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 160.2 95.96 59.9  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Repair / renovation / overhauling of Iron elimination Plant of 100 cum capacity (aprox) for Nischintapur Water Supply Scheme under South 24-Pgns. W/S Division-I, PHE Dte. [TSM/013413] AE SWSD-I ORD/000327/2022-2023 2044/SWD-I 30/11/2022 15 RAMASISH ENTERPRISE 12.92 12.92 100 50
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Sinking of 02 (two) nos. Replacement Rig bored 250 mm x 150 mm dia & 300 mtr. deep tube-well by rotary method for water supply at Nandarampur W/S Scheme and Buita W/S Scheme of Budge Budge-I Block under South 24-Parganas W/S Division-I, PHE Dte. AE SWSD-I ORD/000304/2022-2023 1884/SWD-I 16/11/2022 30 SUBHRA ENTERPRISE 30.03 26.46 88.11 50
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Additional work for sinking of 02 (two) Nos. Rig bored 250 mm x 150 mm dia. & 300 mtr. deep Tube well to achieve 66 mtr. housing pipe by Rotary Method for Nandarampur&Buita PWSS for repair and replacement of Tubewell zones of different W/S Scheme under Budge Budge-I Block under South 24-Parganas W/S Division- I, P.H.E. Dte. [TSM/013413] AE SWSD-I ORD/000696/2022-2023 3499/SWD-I 16/03/2023 15 SUBHRA ENTERPRISE 3.14 3.14 100 0
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Repairing Rising Main from Existing Tubewell to existing OHR for BUITA Distribution Zone for Repair and Replacement of Tube Well Zones of Different Water Supply Schemes under Budge Budge I under South 24 Pgs W/S Division-I, PHE Dte. Dist. South 24 Pgs. (TSM/013413) AE SWSD-I ORD/000746/2022-2023 3597/SWD-I 23/03/2023 30 PEECON 3.28 3.05 92.99 0
5 SOUTH 24 PARAGANAS S24 Pgns Mechanical Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories for replacement of Tube Well at different water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Budge Budge-I] Assistant Engineer -II Junior Engineer ORD/000611/2022-2023 374/SMD 13/02/2023 90 M/S. S.S. ENTERPRISE 22.21 21.32 95.99 60
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Interconnection for Replacement Tubewell of Buita Water Supply Scheme under "Repair And Replacement of TubeWell Zones of Different Water Supply Scheme under Budge Budge-I Under South 24 Pgns. W/S Division-I, PHE Dte. (TSM/ 013413) AE SWSD-I JE-2 ORD/000243/2023-2024 1440/SWD-I 18/07/2023 30 ENVIROEXCELSIOR SOLUTIONS PRIVATE LIMITED 4.84 2.41 49.79 100
7 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Laying Rising Main from Existing Tubewell to existing OHR for JAMALPUR & MOUKHALI Distribution Zone with interconnection and bypass arrangement including interconnection of Distribution mains for Repair and Replacement of Tube Well Zones of Different Water Supply Schemes under Budge Budge I under South 24 Pgs W/S Division-I, PHE Dte. Dist. South 24 Pgs. (TSM/013413) AE SWSD-I ORD/000780/2022-2023 3664/SWD-I 29/03/2023 45 M/S. S.S. ENTERPRISE 19.82 11.69 58.98 75
8 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Boundary Wall for proposed Pump House Site at Abhirampur for Repair and Replacement of Tube Well Zones of Different Water Supply Schemes under Budge Budge I under South 24 Pgs W/S Division-I, PHE Dte. Dist. Sdouth 24 Pgs. (TSM/013413) AE SWSD-I JE-1 ORD/000747/2022-2023 3598/SWD-I 23/03/2023 60 SANJAY MIDDEY 6.47 2.53 39.1 100
9 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Road restoration of Inter connection of DI pipeline with distribution in Uttar Roypur Water Supply Scheme Head Work Site for Repair And Replacement of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24-Partganas, W/S Division-I, PHE Dte. (TSM/013413) [2nd call] AE SWSD-I JE-1 ORD/000717/2023-2024 360/SWD-I 16/01/2024 30 SRIJON ENTERPRISE 7.83 3.91 49.94 100
10 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Inter connection of DI pipeline with distribution in Uttar Roypur Water Supply Scheme Head Work Site for Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge -I Under South 24-Partganas, W/S Division-I, PHE Dte. (TSM/013413) AE SWSD-I JE-1 ORD/000616/2023-2024 2800/SWD-I 09/11/2023 45 SRIJON ENTERPRISE 10.94 8.04 73.49 100
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Renovation of external illumination arrangement with other allied works at PH No-1 under Nandarampur Supply Scheme, under South 24-Pgs Mechanical Division,PHE Dte (Block: Budge Budge-I) (SM/12884) Assistant Engineer -II Junior Engineer ORD/002100/2023-2024 156-AE-II-SMD 09/02/2024 15 MAA SUSOMA & COMPANY 0.75 0.49 65.33 100
12 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs. , SM/12884 Augmentation Road restoration due to laying of pipeline at different nodes under repair and replacement of tubewell zones of different Water Supply Schemes under Budge Budge-I under South 24-Pgns. Water Supply Division-I, PHE Dte. District South 24-Parganas. (SM/12884) AE SWSD-I JE-1 ORD/000781/2023-2024 809/SWD-I 16/02/2024 45 PROJECT AND MAINTENANCE 37.97 0.00 0 70
Total 160.19 95.96 59.9