Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 431.08 109.29 25.35  
1 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Preparation and submission of Detailed Project Report of "DEULI Ground Water Based Piped Water Supply Scheme" in BISHNUPUR-I block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE SWSD-II ORD/000404/2022-2023 459/SWD-I 24/05/2022 15 GEO SOLUTION 2.55 2.55 100 100
2 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Material Requisition To Resource Division RTOR000103/2022-2023 3249/SWD-I 01/03/2023 Resource Division 32.53 0.00 0 0
3 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Development of low land and temporary aproach road for entering Tubewell site for proposed DEULI Piped Water Supply Scheme in Bishnupur-I Block for Augmentation of Surface Water Based Water Supply Scheme in the Arsenic Affected Areas of South 24 Pgs. Dist. under South 24 Pgs. Water Supply Division-I, PHE Dte. [TSM/011201] AE SWSD-II JE2 ORD/000810/2022-2023 3702/SWD-I 30/03/2023 15 SIMPLEX DRILLING COMPANY 0.90 0.86 95.56 100
4 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Sinking of Rig bored 250mm x 150mm dia. & 300 mtr. Deep Tubewell by Rotary method for DEULIPIPE WATER SUPPLY SCHEME in the Arsenic affected areas of South 24 Pgs. Dist. in BISHNUPUR-I Block under South 24 Pgs W/S Sub-Division-II, P.H.E. Dte. AE SWSD-II JE2 ORD/000032/2022-2023 916/SWD-I 19/07/2022 30 SIMPLEX DRILLING CO. 14.19 12.86 90.63 100
5 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of DEULI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11498) (2nd Call) AE SWSD-II JE2 ORD/000094/2023-2024 451/SWD-I 04/05/2023 60 M/S ASHA ENGINEERING 6.05 5.79 95.7 100
6 SOUTH 24 PARAGANAS Bishnupur - I S24 Pgns Mechanical Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/03670/2023-2024 BP-2023-24-392 23/11/2023 WBSEDCL 16.78 0.00 0 0
7 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Sinking of Rig bored 250mm x 150mm dia. & 300 mtr. deep Tubewell having 66 mtr. housing pipe by Rotary method at Second Tubewell site for DEULI PWSS of BISHNUPUR-I block for Augmentaion of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district under South 24-Parganas W/S Division-I, P.H.E. Dte. [TSM/011201] AE SWSD-II JE2 ORD/000596/2022-2023 3116/SWD-I 24/02/2023 30 CIVIL CONSULTANT 15.88 0.00 0 0
8 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Laying Distribution System with providing Functional Household Tap Connection (FHTC) for Proposed DEULI PIPE WATER SUPPLY SCHEME in the Arsenic affected areas of South 24-Pgs. Dist. in BISHNUPUR-I Block under South 24 Pgs W/S Sub-Division -II, P.H.E. Dte. [No. of FHTC = 822] AE SWSD-II JE2 ORD/000427/2022-2023 2565/SWD-I 10/01/2023 60 TANMOY ROY CHOWDHURY 123.95 80.71 65.11 80
9 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Laying of Additional Pipeline for distribution system, rising main, construction of boundary walls, pump house and other allied works for Deuli PWSS to accommodate FHTC in Bishnupur - I Block under South 24 parganas W/S Divn-I, PHE Dte. South 24 Pgns District. (SM/11498) ORD/000265/2024-2025 2680/SWD-I 07/06/2024 45 SWATHI ENTERPRISE 76.00 0.00 0 0
10 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Construction of Boundary Wall & other allied works at 12 (twelve) nos. Head Work Sites of different PWSS within Bishnupur-I Block, Dist.-South 24-Parganas for Augmentation of Surface Water based Water Supply Scheme in the Arsenic Affected areas of South 24-Parganas District. AE SWSD-II JE1,JE2,JE4 ORD/000209/2023-2024 1377/SWD-I 12/07/2023 150 CONCORD PROJECTS PVT. LTD. 105.47 0.00 0 15
11 SOUTH 24 PARAGANAS Bishnupur - I S24 Pgns Mechanical Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, of Deuli water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Bishnupur-I] Assistant Engineer -II Junior Engineer ORD/000467/2022-2023 278/SMD 01/02/2023 90 AHALYA ENGINEERING WORKS 26.76 6.52 24.36 50
12 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based DEULI piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11498 New Pipeline Protection for DEULI PWSS to accommodate FHTC in Bishnupur-I Block under South 24 Pgs W/S Sub-Division -I, P.H.E. Dte. (SM/11498) ORD/000419/2024-2025 3748/SWD-I 28/08/2024 45 NIRMAL UDYOG 10.02 0.00 0 0
Total 431.08 109.30 25.35