Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 616.49 124.76 20.24  
1 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Material Requisition To Resource Division RTOR000072/2023-2024 293/SWD-I 24/04/2023 Resource Division 38.58 0.00 0 0
2 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/00010/2023-2024 BP-2023-24-46 18/05/2023 WBSEDCL 3.13 0.00 0 0
3 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Improvement of outdoor illumination arrangement with allied works at PH-2 of Piyali Kolaghat w/s scheme under South 24-Pgs Mechanical Division PHE Dte. [Block:Baruipur] ORD/000895/2023-2024 1O62/SMSD 10/08/2023 15 NUPUR CHANDRA HALDER 0.87 0.86 98.85 100
4 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Construction of 02 (Two) nos. chlorination room at PIYALI KOLAGHATA (Zone-II) of Baruipur Block for disinfection of ground water from big dia tube well due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [TSM/010734] AE BSD JE-2 ORD/000159/2022-2023 1412/SWD-I 22/09/2022 60 M/S. SREEJIT ENTERPRISE 10.99 4.57 41.58 50
5 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Sinking of 02 (two) nos. Rig bored 300mm x 200mm dia. & 300 mtr. deep Tubewell by Rotary method for PIYALI KOLAGHATA (Part-II) PWSS of Baruipur Block under South-24 Pns W/S- Divn-I, PHE Dte., within South 24 Parganas District. AE BSD ORD/000105/2022-2023 1231/SWD-I 07/09/2022 30 BARI ENTERPRISE 40.12 25.30 63.06 100
6 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Additional work for Sinking of 02 (Two) nos. Rig bored 300mm X 200mm dia & 300 mtr. deep Tubewell to achieve 66 mtr. housing pipe by Rotary method for Water supply arrangement for PWSS of PIYALI KOLAGHATA (Part-II) PWSS of Baruipur Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24-Pgns. district under South 24 Paraganas Water Supply Division-I, PHE Dte. [TSM/010734] AE BSD ORD/000456/2023-2024 2115/SWD-I 30/08/2023 15 BARI ENTERPRISE 4.40 1.02 23.18 100
7 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Preparation and submission of Detailed Project Report of PIYALI KOLAGHATA , PART-II Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. ORD/000507/2021-2022 1906/SWD-I 27/01/2022 30 RADIANT 2.76 1.38 50 100
8 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Providing 100% FHTC & Laying distribution system from Big dia deep Tube Well under ground water based piped water supply scheme at Piyali Kolaghata (Solghoalia C.T, J.L- 25) of Baruipur Block, under surface water based W/S scheme in the arsenic affected areas of South 24 Parganas dist.(PART-II) (No. of FHTC = 1906) AE BSD JE-1 ORD/000237/2022-2023 1712/SWD-I 02/11/2022 120 M/S. S.S. ENTERPRISE 285.60 48.10 16.84 90
9 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1& 2, of Piyali Kolaghata water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000532/2022-2023 459/SMD 17/02/2023 90 NUPUR CHANDRA HALDER 21.83 15.03 68.85 80
10 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Construction of Platform for providing FHTC for Ground Water Based PIYALI KOLAGHATA (PART-II) piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte. for AUGMENTATION of surface water based water supply scheme in the Arsenic Affected Areas of South 24 Parganas District. (SM/11279) ORD/000306/2024-2025 3219/SWD-I 18/07/2024 60 M/S. S.S. ENTERPRISE (NODAKHALI) 35.48 0.00 0 0
11 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Construction of boundary wall including development of land and other allied works for Ground water based PIYALI KOLAGHATA(P-II) piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Areas of South 24 Parganas District. (SM/11279) ORD/000312/2024-2025 3239/SWD-I 19/07/2024 45 M/S. S.S. ENTERPRISE (NODAKHALI) 31.32 0.00 0 0
12 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Supply & fixing main switch & Bus Bar at Pump House no-1 of Piyali KOLAGHATA W/S Scheme under SMD, P.H.E. Dte.(Block-Baruipur) (SM/11279) Assistant Engineer Junior Engineer ORD/000216/2024-2025 490/SMSD 23/04/2024 15 NUPUR CHANDRA HALDER 0.29 0.00 0 0
13 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Improvement of outdoor Illumination arrangement with allied works at Pump House no.1 of Piyali KOLAGHATA (Part-II) W/S Scheme under SMD, P.H.E. Dte.(Block-Baruipur) (SM/11279) Assistant Engineer Junior Engineer ORD/000215/2024-2025 491/SMSD 23/04/2024 15 NUPUR CHANDRA HALDER 0.89 0.00 0 100
14 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme at Piyali Kolaghata Baruipur Block within South 24-Pgns. District under South 24-Pgns W/S Division-I, PHE Dte. , SM/11279 New Providing 100% FHTC & Laying distribution system from Big dia deep Tube Well under ground water based piped water supply scheme at piyali kolaghata (Solghoalia C.T, J.L- 25) of Baruipur Block, under surface water based W/S scheme in the arsenic affected areas of South 24 Parganas dist.(PART-I) (No. of FHTC = 1032) AE BSD JE-2 ORD/000271/2022-2023 1798/SWD-I 09/11/2022 90 KARUNAMOYEE ENTERPRISE 140.23 28.50 20.32 75
Total 616.49 124.76 20.24