Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 827 175.68 21.24  
1 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Construction of 02 (Two) nos. chlorination room at PURBA GABBERIA (Zone-II) of Joynagar-I Block for disinfection of ground water from big dia tube well due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [TSM/010754] AE BSD ORD/000158/2022-2023 1411/SWD-I 22/09/2022 60 ANANDA MAITY 11.01 0.00 0 100
2 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Preparation and submission of Detailed Project Report of PURBA GABBERIA(II) Ground Water Based Piped Water Supply Scheme in JOYNAGAR-I Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE BSD ORD/000363/2021-2022 1930/SWD-I 27/01/2022 30 MS R. DUTTA AND CO 2.76 2.76 100 100
3 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Additional work for sinking of 02 (two) nos. Rig bored 300 mm x 200 mm dia. & 300 mtr. deep Tube well to achieve 66 mtr. housing pipe by Rotary Method for Purba Gabberia Zone-II PWSS of Joynagar-I Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district under South 24-Parganas W/S Division- I, P.H.E. Dte. [TSM/010754] AE BSD ORD/000019/2023-2024 42/SWD-I 06/04/2023 15 M/S. S M ENTERPRISE 4.40 0.00 0 0
4 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Material Requisition To Resource Division RTOR000070/2023-2024 292/SWD-I 24/04/2023 Resource Division 76.13 0.00 0 0
5 SOUTH 24 PARAGANAS Jaynagar - I S24 Pgns Mechanical Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, Zone-II of Purba Gabberia water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Jaynagar-I] Assistant Engineer Junior Engineer ORD/000558/2022-2023 572/SMD 22/02/2023 90 DEBJYOTI BASU 19.37 0.00 0 0
6 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Sinking of 02 (two) nos. Rig bored 300mm x 200mm dia. & 300 mtr. deep Tubewell by Rotary method for PURBA GABBERIA (Zone-II) PWSS of Joynagar-I Block under South-24 Pns W/S- Divn-I, PHE Dte., within South 24 Parganas District. AE BSD ORD/000107/2022-2023 1232/SWD-I 07/09/2022 30 M/S. S M ENTERPRISE 40.13 2.72 6.78 15
7 SOUTH 24 PARAGANAS Jaynagar - I S24 Pgns Mechanical Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/05022/2023-2024 BP-2023-24-571 12/03/2024 WBSEDCL 10.24 0.00 0 0
8 SOUTH 24 PARAGANAS Jaynagar - I South 24 Pgs W/S Division I Ground water based piped water supply scheme for Purba Gabberia (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Jaynagar-I District South 24-Pgns. , SM/11276 New Construction of 350 m3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir as per departmental design, drawing & specification including R.C.C. Bored Pile & Pile Cap after soil investigation alongwith Providing 100% FHTC & Laying distribution system from Big dia deep Tube Well at PURBO GABBERIA (Zone-II) Mouza of JOYNAGAR-I Block due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. (No. of FHTC = 2086) AE BSD JE-1 ORD/000372/2022-2023 2316/SWD-I 19/12/2022 300 M/S. S.S. ENTERPRISE 662.96 170.20 25.67 20
Total 826.99 175.67 21.24