Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 82.44 37.86 45.92  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. , SM/09948 Retrofitting Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. VCH/001194/2021-2022 BP-2021-22-219 30/03/2022 PREMANANDA ROY BISWAS 15.50 0.00 0 0
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. , SM/09948 Retrofitting Material Requisition To Resource Division RTOR000123/2022-2023 3472/SWD-I 15/03/2023 Resource Division 2.21 0.00 0 0
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. , SM/09948 Retrofitting Repair of Concrete Road in Budge Budge I Block for laying of Pipeline within Betuabati W/S Scheme under South 24 Pargana W/S Divn. - I, P.H.E Dte. (TSM/8299) Part -D AE SWSD-I ORD/000462/2022-2023 2779/SWD-I 31/01/2023 45 M/S. SREEJIT ENTERPRISE (EMAIL ID- RAYTARUN1974@GMAIL.COM) 7.62 7.59 99.61 0
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. , SM/09948 Retrofitting Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. AE SWSD-I JE-1 ORD/000102/2021-2022 1103/SWD-I 25/10/2021 120 PREMANANDA ROY BISWAS 57.11 30.27 53 100
Total 82.44 37.86 45.92