Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 997.25 171.82 17.23  
1 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Inter connection and rising main with supply of specials of Augmentation of Pathankhali (Zone-I) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/000491/2023-2024 1931/AD 01/08/2023 45 NATURAL RESOURCES CONSORTIUM 51.20 0.00 0 0
2 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Conducting route survey, design distribution network and preparation & submission of DPR for Pathankhali (Zone-I) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000607/2023-2024 1829/AD 27/07/2023 45 TECH VISION 7.45 7.45 100 99
3 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Material Requisition To Resource Division RTOR000049/2023-2024 256/AD 24/04/2023 0 Resource Division 124.68 0.00 0 0
4 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Construction of OHR (350 Cum), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water based Augmentation Piped Water Supply Scheme for the PATHANKHALI (ZONE-I), Block-Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000485/2023-2024 1998/AD 04/08/2023 300 M/S SHIBAM ENTERPRISE 711.48 164.37 23.1 25
5 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Construction of boundary wall at Pump House no.1 for Augmentation of Pathakhali (Zone-I) Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000730/2024-2025 4388/AD 05/11/2024 30 KANAN CONSTRUCTION 28.81 0.00 0 0
6 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Material Requisition To Resource Division RTOR000410/2023-2024 364/AD 19/01/2024 0 Resource Division 14.32 0.00 0 0
7 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Sinking of 250mm x 150mm dia. 360 mtr. deep (Replacement) Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Augmentation of Pathankhali (Zone - I) W/S Scheme, Block - Gosaba under Canning Sub Division of Alipore Division, PHE Dte. (Tubewell No. - 4) (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000743/2024-2025 4417/AD 05/11/2024 30 MOSTAFIZUR HAQUE GAINE 22.43 0.00 0 25
8 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Construction of boundary wall at Pump House No. - 2 for Ground Water Based at Bipradaspur Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002495/2024-2025 788/AD 25/02/2025 30 REZU CONSTRUCTION 12.42 0.00 0 0
9 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Renovation and retrofitting of Pump House No. 2 of Augmentation of Pathankhali W/S Scheme (Zone-I), under Gosaba Block of Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000185/2025-2026 549/CSD 30/04/2025 30 LASKAR CONSTRUCTION 2.49 0.00 0 100
10 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Inter connection and rising main with supply of specials of Augmentation of Pathankhali (Zone - l) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000094/2025-2026 2523/AD 30/05/2025 45 SURYA ENTERPRISE 19.50 0.00 0 0
11 Alipore Division AUGMENTATION OF PATHANKHALI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , Renovation and retrofitting of Pump House No. 1 of Augmentation of Pathankhali W/S Scheme (Zone-I), under Gosaba Block of Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000301/2025-2026 623/CSD 20/05/2025 30 A.K. ENTERPRISE 2.47 0.00 0 0
Total 997.28 171.82 17.23