Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 3,023.19 184.22 6.09  
1 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Sinking of 250mm x 150mm dia. 350 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. -3 of Sonakhali Water Supply Scheme (Zone-II), Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000056/2022-2023 792/AD 12/05/2022 30 G.B. CONSTRUCTION (TW) 17.99 16.86 93.72 94
2 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Conducting route survey, design distribution network and preparation & submission of DPR for Sonakhali (Zone-II) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001852/2022-2023 11818/AD 23/02/2023 45 TECH VISION 4.56 4.56 100 0
3 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Inter connection in between the replacement tubewell towards distribution system for Sonakhali W/S Scheme (Zone-II), Block - Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. (TW-2) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/001255/2023-2024 1203/CSD 10/11/2023 30 C.S. CONSTRUCTION 1.01 0.00 0 0
4 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Material Requisition To Resource Division RTOR000036/2023-2024 241/AD 24/04/2023 0 Resource Division 85.44 0.00 0 0
5 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , onstruction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sonakhali W/S Scheme (Zone-II), Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House No. III] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000313/2024-2025 2694/AD 24/06/2024 45 SAHANA ENTERPRISE 7.08 0.00 0 0
6 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Material Requisition To Resource Division RTOR000393/2023-2024 334/AD 19/01/2024 0 Resource Division 7.52 0.00 0 0
7 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Laying Distribution System, Providing Functional Household Tap Connection for Ground Water Based Augmentation Piped Water Supply Scheme for the Sonakhali (Zone-II), Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1220] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000256/2023-2024 1444/AD 13/07/2023 60 RIVER BENZ CONSTRUCTION 265.52 162.80 61.31 81
8 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design & Drawing ) with 20 mtr. staging height including Geo-Technical investigation, foundation, pipeline connection and cost of pipes , specials etc. for augmentation of different piped water supply scheme of Canning-I, Canning-II & Basanti Block under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD,Junior Engineer,1 CSD ORD/002461/2023-2024 1512/AD 13/03/2024 600 NATIONAL PROJECTS CONSTRUCTION CORPORATION LTD 2,624.49 0.00 0 30
9 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Repairing & renovation of Pump House no. - 2 of Sonakhali (Zone-II) W/S Scheme Block - Basanti under Canning Sub- Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000289/2025-2026 692/CSD 26/05/2025 30 A.M. ENTERPRISE 2.71 0.00 0 98
10 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Surging of 03 nos. Big dia Tubewell of Sonakhali (Zone-II) (TW-2) and Harbhangi (TW-3 & 4) W/S Scheme under JJM, Block - Basanti under Canning Sub-Division under Alipore Division P.H.Engg. Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000241/2025-2026 680/CSD 26/05/2025 30 FORTUNE ENGINEERING 4.30 0.00 0 0
11 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. , Repairing & renovation of Pump House no. - 1 of Sonakhali (Zone-II) W/S Scheme Block - Basanti under Canning Sub- Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000288/2025-2026 691/CSD 26/05/2025 30 A.M. ENTERPRISE 2.57 0.00 0 98
Total 3,023.19 184.22 6.09