Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
20 882.48 282.75 32.04  
1 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Inter connection and rising main with supply of specials of Augmentation of Sadhupur (Zone-I) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000097/2023-2024 453/AD 08/05/2023 15 UNIVERSAL CONSTRUCTION 19.52 0.00 0 0
2 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Conducting route survey, design distribution network and preparation & submission of DPR for Sadhupur (Zone-I) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001931/2022-2023 11804/AD 22/02/2023 45 M/S R.DUTTA & CO. 6.53 6.53 100 95
3 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Material Requisition To Resource Division RTOR000059/2023-2024 379/AD 02/05/2023 0 Resource Division 67.54 0.00 0 0
4 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Construction of 500 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Sadhupur (Zone-I) piped water supply scheme of Gosaba Block under Canning Sub- Division of Alipore Division, PHE Dte. [No. of FHTC = 2159] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/001195/2023-2024 4045/AD 22/11/2023 300 SUPRITI ENTERPRISE 648.45 261.55 40.33 30
5 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Sinking of 03 (three) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Sadhupur W/S Scheme (Zone - I), Block - Gosaba under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002033/2022-2023 13029/AD 24/03/2023 60 GIASHUDDIN CONSTRUCTION 65.85 14.67 22.28 100
6 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1,2 & 3, Zone-I for Augmentation of Sadhupur Water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Gosaba] Assistant Engineer Junior Engineer ORD/000293/2023-2024 2129/SMD 31/05/2023 947 SUBHRA ENTERPRISE 29.32 0.00 0 90
7 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Construction of boundary wall at Pump House No. - 2 for Ground Water Based Piped Water Supply Scheme for Augmentation of Sadhupur (Zone-I), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000123/2025-2026 2586/AD 03/06/2025 30 KHAN CONSTRUCTION (BASANTI) 10.27 0.00 0 0
8 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply & fixing main switch & Bus Bar at Zone-I, Pump House-1,2, & 3 of Aug of Sadhupur water supply sche under SMD,PHE Dte. (Block-Gosaba) (SM/15965) Assistant Engineer Junior Engineer ORD/001856/2024-2025 105/SMSD 21/01/2025 15 SUBHRA ENTERPRISE 0.92 0.00 0 0
9 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Valve & UPVC column pipe etc. at Zone-I PH-3 Aug of Sadhupur water supply scheme under Gosaba Block under SMD, P.H.E. Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002441/2024-2025 1726/SMSD 27/12/2024 15 SUBHRA ENTERPRISE 0.70 0.00 0 0
10 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Valve & UPVC column pipe etc. at Zone-I PH-1 Aug of Sadhupur water supply scheme under Gosaba Block under SMD, P.H.E. Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002442/2024-2025 1676-A-SMSD 20/12/2024 15 SUBHRA ENTERPRISE 0.70 0.00 0 0
11 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Cast Iron wafer type butterfly valve with 3 phase actuator at Aug of Sadhupur Zone-I, PH-3 water supply scheme under Gosaba block Under SMD PHE Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002445/2024-2025 1768/SMSD 31/12/2024 15 SUBHRA ENTERPRISE 0.99 0.00 0 0
12 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Cast Iron wafer type butterfly valve with 3 phase actuator at Aug of Sadhupur Zone-I, PH-1 water supply scheme under Gosaba block Under SMD PHE Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002446/2024-2025 1766/SMSD 31/12/2024 15 SUBHRA ENTERPRISE 0.99 0.00 0 0
13 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Valve & UPVC column pipe etc. at Zone-I PH-2 Aug of Sadhupur water supply scheme under Gosaba Block under SMD, P.H.E. Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002443/2024-2025 1725/SMSD 27/12/2024 15 SUBHRA ENTERPRISE 0.70 0.00 0 0
14 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Supply delivery of Cast Iron wafer type butterfly valve with 3 phase actuator at Aug of Sadhupur Zone-I, PH-2 water supply scheme under Gosaba block Under SMD PHE Dte. (SM/15965) Assistant Engineer Junior Engineer ORD/002444/2024-2025 1767/SMSD 31/12/2024 15 SUBHRA ENTERPRISE 0.99 0.00 0 0
15 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Improvement of outdoor illumination arrangement with allied works at Zone-I, Pump House-1 of Aug of Sadhupur water supply sche under SMD,PHE Dte. (Block-Gosaba) (SM/15965) Assistant Engineer Junior Engineer ORD/002422/2024-2025 125/SMSD 22/01/2025 15 SUBHRA ENTERPRISE 0.97 0.00 0 0
16 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Improvement of outdoor illumination arrangement with allied works at Zone-I, Pump House-2 of Aug of Sadhupur water supply sche under SMD,PHE Dte. (Block-Gosaba) (SM/15965) Assistant Engineer Junior Engineer ORD/002423/2024-2025 126/SMSD 22/01/2025 15 SUBHRA ENTERPRISE 0.97 0.00 0 0
17 S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Improvement of outdoor illumination arrangement with allied works at Zone-I, Pump House-3 of Aug of Sadhupur water supply sche under SMD,PHE Dte. (Block-Gosaba) (SM/15965) Assistant Engineer Junior Engineer ORD/002419/2024-2025 136/SMSD 22/01/2025 15 SUBHRA ENTERPRISE 0.97 0.00 0 0
18 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Sadhupur W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/001956/2022-2023 12692/AD 14/03/2023 659 BAPAN HALDAR 8.88 0.00 0 100
19 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sadhupur W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002039/2022-2023 13035/AD 24/03/2023 680 MAA SOLAR ENTERPRISE 8.61 0.00 0 100
20 Alipore Division AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sadhupur W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-III] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002040/2022-2023 13036/AD 24/03/2023 680 MAA SOLAR ENTERPRISE 8.61 0.00 0 100
Total 882.45 282.75 32.04