Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 595.85 231.45 38.84  
1 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Pathankhali W/S Scheme (Zone-III), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/001954/2022-2023 12690/AD 14/03/2023 45 PODDER ENTERPRISE 8.92 0.00 0 0
2 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Pathankhali W/S Scheme (Zone-III), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/001955/2022-2023 12691/AD 14/03/2023 45 RIYAZ ENTERPRISE 8.60 0.00 0 0
3 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Sinking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Pathankhali (Zone - III) W/S Scheme, Block - Gosaba under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division ORD/000142/2023-2024 278/AD 24/04/2023 45 MONDAL CONSTRUCTION (MADHYAMGRAM) 43.98 0.00 0 0
4 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Inter connection and rising main with supply of specials of Augmentation of Pathankhali (Zone-III) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000138/2023-2024 838/AD 26/05/2023 15 M/S P. B. CONSTRUCTION 7.50 0.00 0 0
5 S24 Pgns Mechanical Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2, Zone-III for Augmentation of Pathankhali supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Gosaba] Assistant Engineer Junior Engineer ORD/000279/2023-2024 1139/SMD 24/04/2023 90 M/S. S.R. ENTERPRISE 29.83 0.00 0 0
6 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Conducting route survey, design distribution network and preparation & submission of DPR for Pathankhali (Zone-III) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001889/2022-2023 11550/AD 17/02/2023 45 M/S R.DUTTA & CO. 4.29 4.29 100 99
7 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Material Requisition To Resource Division RTOR000412/2023-2024 368/AD 19/01/2024 0 Resource Division 6.36 0.00 0 0
8 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Material Requisition To Resource Division RTOR000719/2023-2024 540/AD 25/01/2024 0 Resource Division 22.19 0.00 0 0
9 Alipore Division Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Construction of 250 m³ capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation of Pathankhali (Zone- III) piped water supply scheme of Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. [No. of FHTC = 1032] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000037/2023-2024 172/AD 19/04/2023 743 SAMSUL ENTERPRISE 453.31 227.16 50.11 56
10 S24 Pgns Mechanical Augmentation of Pathankhali PWSS Zone-III for Providing Functional Household Tap Connection (FHTC) Block - Gosaba , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 3 for Augmentation of Pathankhali Zone-III water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Gosaba] (SM/15561) Assistant Engineer Junior Engineer ORD/000078/2025-2026 1441/SMD 22/05/2025 135 CMS ENGINEERING CONCERN 10.87 0.00 0 0
Total 595.84 231.44 38.84