Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 192.38 24.64 12.81  
1 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Material Requisition To Resource Division RTOR000006/2023-2024 121/AD 13/04/2023 0 Resource Division 0.34 0.00 0 0
2 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Material Requisition To Resource Division RTOR000015/2023-2024 220/AD 21/04/2023 0 Resource Division 61.12 0.00 0 0
3 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Material Requisition To Resource Division RTOR000141/2023-2024 853/AD 27/05/2023 0 Resource Division 1.72 0.00 0 0
4 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Narayanpur W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (PH - 4) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/001682/2022-2023 11489/AD 15/02/2023 45 R CONSTRUCTION 7.11 0.00 0 98
5 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 4 of Augmentation of Narayanpur W/S Scheme, Block - Canning-II under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/001663/2022-2023 11475/AD 15/02/2023 30 SARFARAZ CONSTRUCTION 19.59 18.77 95.81 90
6 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H.1 for Augmentation of Narayanpur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] Assistant Engineer Junior Engineer ORD/000288/2023-2024 1148/SMD 24/04/2023 834 NITESH MANAGEMENT 11.16 5.87 52.6 95
7 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Inter connection and rising main with supply of specials at PH-IV of Narayanpur W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd call) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000734/2023-2024 2895/AD 19/09/2023 45 DIPTI ENTERPRISE 70.53 0.00 0 60
8 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Improvement of outdoor illumination arrangement with allied works at Pump House- 1 of Aug of Narayanpur water supply sche under SMD,PHE Dte. (Block-Canning-II) (SM/15045) Assistant Engineer Junior Engineer ORD/001771/2024-2025 71/SMSD 17/01/2025 15 NITESH MANAGEMENT 0.92 0.00 0 0
9 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Relaying of pipeline, damaged due to construction of culvert by PWD of Narayanpur W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/002552/2024-2025 1415/CSD 10/12/2024 25 SUJOY SADHUKHAN 0.49 0.00 0 98
10 Alipore Division AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Construction of boundary wall and Land development for Tube Well No. 4 Site at Narayanpur W/S Scheme, Block - Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000311/2025-2026 2964/AD 25/06/2025 30 CHATTERJEE CONSTRUCTION 19.11 0.00 0 0
11 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF NARAYANPUR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , Supply & fixing main switch & Bus Bar at Pump House- 1 of Aug of Narayanpur water supply sche under SMD,PHE Dte. (Block-Canning-II) (SM/15045) Assistant Engineer Junior Engineer ORD/001770/2024-2025 70/SMSD 17/01/2025 15 NITESH MANAGEMENT 0.29 0.00 0 0
Total 192.37 24.64 12.81