Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 384.96 50.02 12.99  
1 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Goranbose W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. (PH - 5) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001712/2022-2023 11676/AD 20/02/2023 45 BABAMONI CONSTRUCTION 7.10 0.00 0 0
2 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , inking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 4 & 5 of Augmentation of Goran Bose W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001670/2022-2023 11481/AD 15/02/2023 45 RAHAMAN ENTERPRISE 39.19 0.00 0 0
3 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2 for Augmentation of Goranbose water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/000018/2023-2024 953/SMD 04/04/2023 90 KARUNAMOY ENGINEERING 26.02 0.00 0 0
4 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Material Requisition To Resource Division RTOR000040/2023-2024 246/AD 24/04/2023 0 Resource Division 81.96 0.00 0 0
5 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Providing Functional Household Tap Connection (FHTC) to all the households in Garan Bose Water Supply Scheme, Block - Basanti, South 24 Pgs. District under Alipore Division, P.H.E. Dte. including Operation & Maintenance of scheme for 1 (one) year. Assistant Engineer, Canning sub division ORD/001301/2020-2021 2275/AD 12/10/2020 365 M/S. BLUE BELL ENTERPRISE 136.08 16.52 12.14 63
6 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Inter connection and rising main with supply of specials from Head work site to PH-IV and Head work site to PH-V of Goranbose W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/002043/2022-2023 13043/AD 24/03/2023 45 SUNNY CONSTRUCTION 42.98 16.41 38.18 40
7 Alipore Division AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Additional work for retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to additional households (620 nos.) in excess of IMIS in connection with Jal Jeevan Mission (JJM) for Goranbose Water Supply Scheme including one year Operation and Maintenance of scheme, Block - Basanti South 24 Pgs. District under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/002003/2022-2023 12817/AD 16/03/2023 45 MS SINHA ROY & CO 49.13 17.09 34.79 40
8 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Improvement of outdoor Illumination arrangement with allied works at Pump House no-2 of Goranbose W/S Scheme under SMD, P.H.E. Dte.(Block-Basanti)(SM/15044) Assistant Engineer Junior Engineer ORD/001172/2024-2025 122/SMSD 22/01/2025 15 KARUNAMOY ENGINEERING 0.96 0.00 0 0
9 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Improvement of outdoor Illumination arrangement with allied works at Pump House no-1 of Goranbose W/S Scheme under SMD, P.H.E. Dte.(Block-Basanti)(SM/15044) Assistant Engineer Junior Engineer ORD/001171/2024-2025 121/SMSD 22/01/2025 15 KARUNAMOY ENGINEERING 0.96 0.00 0 0
10 S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF GORANBOSE PWSS FOR PROVIDING FHTC BLOCK-BASANTI , Supply & Fixing main switch & Bus bar at Pump House no-1 & 2 of Goranbose W/S Scheme under SMD, P.H.E. Dte.(Block-Basanti)(SM/15044) Assistant Engineer Junior Engineer ORD/001170/2024-2025 120/SMSD 22/01/2025 15 KARUNAMOY ENGINEERING 0.58 0.00 0 0
Total 384.97 50.02 12.99