Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 550.61 51.34 9.32  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation Material Requisition To Resource Division RTOR000042/2023-2024 249/AD 24/04/2023 Resource Division 32.05 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation Material Requisition To Resource Division RTOR000163/2023-2024 1056/AD 15/06/2023 Resource Division 7.19 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation Inter connection and rising main with supply of specials of Augmentation of Sudhansupur W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000490/2023-2024 1791/AD 26/07/2023 30 M/S MODINA ENTERPRISE 15.27 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation Survey, Design and DPR preparation for Augmentation of ground water based Sudhanshupur Water Supply Scheme to accommodate FHTC in Gosaba Block of South 24 Parganas District under Alipore Division, PHE Dte. Assistant Engineer, Canning sub division ORD/002065/2022-2023 1470/CSD 28/03/2023 15 TECH VISION 3.84 3.76 97.92 95
5 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation PAYMENT OF ELECTRICITY BILL FOR NEW SERVICE CONNECTION UNDER SMD PHE DTE. BILL/05699/2023-2024 BP-2023-24-609 28/03/2024 WBSEDCL 3.29 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF SUDHANSUPUR PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/14466 Augmentation Construction of 150 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Sudhanshupur piped water supply scheme of Gosaba Block under Canning Sub- Division of Alipore Division, PHE Dte. [No. of FHTC = 1167] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000294/2023-2024 1504/AD 15/07/2023 300 SARDAR ENTERPRISE 488.97 47.58 9.73 30
Total 550.60 51.34 9.32