Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 512.97 62.81 12.24  
1 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Material Requisition To Resource Division RTOR000044/2023-2024 251/AD 24/04/2023 Resource Division 50.79 0.00 0 0
2 SOUTH 24 PARAGANAS Gosaba S24 Pgns Mechanical GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, of Kamarpara water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Gosaba] Assistant Engineer Junior Engineer ORD/000552/2022-2023 497/SMD 20/02/2023 90 AVINABA ENGINEERING CONCERN 20.09 0.00 0 0
3 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Material Requisition To Resource Division RTOR000165/2023-2024 1047/AD 15/06/2023 Resource Division 8.89 0.00 0 0
4 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Kamarpara W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House-I) (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000253/2023-2024 1396/AD 12/07/2023 45 RAKTIM ENTERPRISE 8.88 0.00 0 0
5 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kamarpara W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House-II) (2nd call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000254/2023-2024 1397/AD 12/07/2023 45 RAKTIM ENTERPRISE 8.57 0.00 0 0
6 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Conducting route survey, design distribution network and preparation & submission of DPR for Kamarpara New Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001886/2022-2023 7599/AD 28/11/2022 45 M/S R.DUTTA & CO. 4.49 4.49 100 95
7 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Inter connection and rising main with supply of specials of Augmentation of Kamarpara W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000732/2023-2024 2893/AD 19/09/2023 15 M/S. MIHIR KUMAR NASKAR 13.26 0.00 0 0
8 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Construction of 150 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Kamarpara piped water supply scheme of Gosaba Block under Canning Sub- Division of Alipore Division, PHE Dte. [No. of FHTC = 1443] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000293/2023-2024 1503/AD 15/07/2023 300 PROJECT INDIA 354.06 58.32 16.47 60
9 SOUTH 24 PARAGANAS Gosaba Alipore Division GROUND WATER BASED KAMARPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS , SM/13838 New Sinking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Kamarpara W/S Scheme, Block - Gosaba under Canning Sub Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000386/2023-2024 1575/AD 17/07/2023 45 GIASHUDDIN CONSTRUCTION 43.94 0.00 0 100
Total 512.97 62.81 12.25