Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
18 471.02 250.13 53.1  
1 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme (THANGARA PWSS) including Functional Household Tap Connection (FHTC) for implementation of JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000502/2022-2023 2495/AD 27/06/2022 45 LEMNISCATE 3.94 3.94 100 100
2 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Thangara PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Raidighi Sub Division ORD/000051/2023-2024 37/KSD 24/04/2023 4 GEOTECHNICAL ENGINEERS CONSORTIUM 0.49 0.49 100 0
3 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Thangara W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000344/2022-2023 4071/AD 18/08/2022 45 AQUATECH ENGINEERS 37.06 32.64 88.07 0
4 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Material Requisition To Resource Division RTOR000119/2023-2024 655/AD 17/05/2023 0 Resource Division 5.66 0.00 0 0
5 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Material Requisition To Resource Division RTOR000441/2023-2024 4709/AD 18/12/2023 0 Resource Division 42.17 0.00 0 0
6 S24 Pgns Mechanical GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/01714/2023-2024 BP-2023-24-203 09/08/2023 0 WBSEDCL 8.38 0.00 0 0
7 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Construction of 250 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation & pile cap after soil investagation including O & M of distribution system, rising main, FHTC for 1 year after completion of FHTC works for Thangara Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-A) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_4, Kakdwip Sub Division ORD/001316/2022-2023 9881/AD 10/01/2023 300 PATHIK PABAN NANDI 281.34 156.42 55.6 55
8 S24 Pgns Mechanical GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, Zone-I of Thangara water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Kakdwip] Assistant Engineer -I Junior Engineer ORD/000432/2022-2023 3828/SMD 29/12/2022 90 M/S. S.S. ENTERPRISE 21.52 19.74 91.73 98
9 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Construction, placing and fixing of FHTC platform at every individual beneficiary etc. at Thangara W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (SM/11850) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000464/2024-2025 3423/AD 21/08/2024 30 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 21.44 0.00 0 0
10 S24 Pgns Mechanical GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Improvement of outdoor illumination arrangement with allied works at , PH-1 of Thangara W/S Scheme under JJM under South 24-Pgs Mechanical Division,PHE Dte. [Block-Kakdwip] Assistant Engineer -I Junior Engineer ORD/002994/2023-2024 443-AE-I-SMD 20/02/2024 15 M/S. S.S. ENTERPRISE 0.89 0.00 0 0
11 S24 Pgns Mechanical GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Improvement of outdoor illumination arrangement with allied works at , PH-2 of Thangara W/S Scheme under JJM under South 24-Pgs Mechanical Division,PHE Dte. [Block-Kakdwip] Assistant Engineer -I Junior Engineer ORD/002995/2023-2024 444-AE-I-SMD 20/02/2024 15 M/S. S.S. ENTERPRISE 0.89 0.00 0 0
12 S24 Pgns Mechanical GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Supply & installation of LED board at P.H. No-1 & 2 of Thangara water supply scheme, under South 24-Pgs Mechanical Division PHE Dte.[Block-Kakdwip] Assistant Engineer -I Junior Engineer ORD/000589/2024-2025 746-AE-I-SMD 28/05/2024 15 M/S. GLOBAL POWER CONCERN 0.78 0.00 0 0
13 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Thangara Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-C) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_4, Kakdwip Sub Division ORD/000334/2022-2023 4064/AD 18/08/2022 30 M/S. GANGA ENTERPRISE 11.81 11.76 99.58 100
14 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Thangara Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-B) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_4, Kakdwip Sub Division ORD/000333/2022-2023 4063/AD 18/08/2022 30 MUKHERJEE ENTERPRISE (II) 17.79 16.56 93.09 95
15 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 2nd Tubewell Site of Thangara W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/001155/2023-2024 3718/AD 03/11/2023 30 M/S. M.S. ENTERPRISE 9.51 8.42 88.54 100
16 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Making and fixing of permanent display board at headwork site of Harendranagar, Ramgopalpur, Uttar Kashiabad, Dakshin Kashiabad, Thangara, Nebutala PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_2, Kakdwip Sub Division ORD/002140/2023-2024 940/KSD 19/12/2023 5 M/S B. ENTERPRISE 0.94 0.16 17.02 100
17 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Material Requisition To Resource Division RTOR000808/2023-2024 653/AD 30/01/2024 0 Resource Division 1.02 0.00 0 0
18 Alipore Division GROUND WATER BASED THANGARA PIPE WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION BLOCK KAKDWIP DISTRICT SOUTH 24PARGANAS DISTRICT , Material Requisition To Resource Division RTOR000991/2023-2024 1784/AD 27/03/2024 0 Resource Division 5.39 0.00 0 0
Total 471.02 250.11 53.1