Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16 520.18 280.19 53.86  
1 HOWRAH Bagnan-II Electrical Matinala Piped Water Supply Scheme , SM/15285 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Matinala water supply scheme, T.W. No.- I & II, Block: Bagnan-II, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000261/2022-2023 928/ED 22/02/2023 90 R.M.D TRADING. 20.38 0.00 0 0
2 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Preparation of DPR for Augmentation of Matinala (Mellock Zone-I) PWSS, Bagnan-II Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu ORD/000225/2022-2023 317/AE/USD 16/08/2022 45 MS SOBHA AND CO 3.61 3.51 97.23 100
3 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Material Requisition To Resource Division RTOR000024/2023-2024 1754/HD 26/04/2023 0 Resource Division 27.35 0.00 0 0
4 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Material Requisition To Resource Division RTOR000048/2023-2024 2979/HD 17/08/2023 0 Resource Division 26.58 0.00 0 0
5 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) at Matinala PWSS of Bagnan-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte. (Part-A) AE/Ulu JE/USD ORD/000882/2022-2023 1436/HD 29/03/2023 120 BISWAJIT BAG 163.00 145.04 88.98 100
6 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Sinking of 5 (Five) No. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Harop PWSS Zone -I (1 no) & Zone-II (2 nos) & Matinala PWSS (2 nos) of Bagnan-I Block of Uluberia Sub-Division under Howrah Division, P.H.E. Dte. AE/Ulu JE-USD,je/blk/bagn1,JE/USD ORD/000249/2023-2024 3533/HD 04/10/2023 60 AQUATECH ENGINEERS 64.95 15.01 23.11 40
7 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Balance Laying of distribution pipeline Matinala PWSS of Bagnan-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte. (Mouza-Mellock) AE/Ulu JE/USD ORD/000585/2023-2024 3104/AE/USD 29/02/2024 45 BISWAJIT BAG 13.00 12.36 95.08 100
8 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Balance Laying of distribution pipeline Matinala PWSS of Bagnan-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte. (Mouza-Matinala) AE/Ulu JE/USD ORD/000687/2023-2024 3242/AE/USD 12/03/2024 45 SUNIRMAN ENTERPRISE 11.92 11.92 100 100
9 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Site preparation and partial land Development at HW site of Matinala PWSS of Bagnan-II Block under Uluberia Sub Division under Howrah Divison PHED. AE/Ulu JE/USD ORD/000175/2024-2025 797/AE/USD 09/09/2024 30 ADITYA HAZRA 4.80 0.00 0 100
10 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Construction of switch room ( 3.60 m x 3.0 m) with water supply sanitary arrangement at 2nd tube well site of Matinala PWSS of Bagnan-II Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte. (As per approved drawing of Howrah Division, PHE Dte.) AE/Ulu JE/USD ORD/000185/2024-2025 769/AE/USD 05/09/2024 45 D.C. CONSTRUCTION 4.68 4.68 100 100
11 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Material Requisition To Resource Division RTOR000096/2023-2024 170/HD 15/01/2024 0 Resource Division 10.29 0.00 0 0
12 HOWRAH Bagnan-II Electrical Matinala Piped Water Supply Scheme , SM/15285 New Quotation for new service connection for Matinala Water Supply Scheme, PH NO- II, in the district Howrah under Electrical Division, PHE Dte. ( SM/15285), Reference Id- 106538620 , Application no- 1007634961 BILL/00087/2024-2025 40 09/04/2024 0 WBSEDCL 4.07 0.00 0 0
13 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Supplying,fitting,fixing and erecting of Swajal Gram (Har Ghar Jal Village) Board at different PWSS of different schemes under Howrah Division P.H.E. Dte. (For, Bagnan-II & Uluberia-II Block) AE HQ ORD/000222/2025-2026 4120/HD 14/10/2025 30 ABONTICA ENTERPRISE 4.79 0.00 0 0
14 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Field level data validation of FHTC for error free database in different Pipe Water Supply Scheme under Amta-I, Amta-II, Bagnan-I, Bagnan-II, Shyampur-I and Shyampur-II Block in the District of Howrah under the jurisdiction of Howrah Division, PHE Dte.(Phase-II). AE HQ ORD/000199/2025-2026 3670/HD 02/09/2025 60 TECH VISION 21.25 0.00 0 0
15 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) of MATINALA PWSS OF BAGNAN-II BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. (PART-C) AE/Ulu JE/USD ORD/000763/2022-2023 705/HD 22/02/2023 721 SUNIRMAN ENTERPRISE 66.28 33.04 49.85 90
16 HOWRAH Bagnan-II Howrah Division Matinala Piped Water Supply Scheme , SM/15285 New Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) MATINALA PWSS OF BAGNAN-II BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. (PART-D) AE/Ulu JE/USD ORD/000764/2022-2023 706/HD 22/02/2023 781 USHA CONCERN 73.23 54.63 74.6 100
Total 520.17 280.19 53.86