| Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 7 | 401.71 | 113.91 | 28.36 | ||||||||||||||
| 1 | HOWRAH | Bagnan-I | Howrah Division | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Sinking of 2 (Two) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Hizlok Head Work Site and 2nd TW Site at Hizlok PWSS of Bagnan-I Block of Howrah District under Howrah Division, P.H.E. Dte. (SM/13747) | AE/Ulu | je/blk/bagn1 | ORD/000133/2024-2025 | 4034/HD | 17/09/2024 | 90 | AQUATECH ENGINEER | 28.95 | 3.84 | 13.26 | 45 |
| 2 | HOWRAH | Bagnan-I | Howrah Division | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Preparation of DPR for Hijlok PWSS, Bagnan-I Block under Uluberia Sub-division of Howrah Division P.H.E Dte. | AE/Ulu | JE-USD | ORD/000366/2022-2023 | 461/AE/USD | 15/09/2022 | 45 | DULAL MAJUMDER | 2.97 | 0.00 | 0 | 100 |
| 3 | HOWRAH | Bagnan-I | Howrah Division | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Additional laying distribution pipeline with FHTC at Bagur & Paschim Bainan Mouza part of Paschim Bainan PWSS adjoining to Hizlak PWSS of Bagnan-I Block in Uluberia Sub-Division under Howrah Division, PHE Dte. | AE/Ulu | JE/USD | ORD/000204/2024-2025 | 4514/HD | 04/10/2024 | 45 | JOY CHANDI CONSTRUCTION | 48.54 | 34.23 | 70.52 | 100 |
| 4 | HOWRAH | Bagnan-I | Howrah Division | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Material Requisition To Resource Division | RTOR000030/2024-2025 | 4864/HD | 22/11/2024 | 0 | Resource Division | 1.54 | 0.00 | 0 | 0 | ||
| 5 | HOWRAH | Bagnan-I | Electrical | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Quotation for new service connection for Hijlak Piped Water Supply Scheme, PH NO- I in the district Howrah under Electrical Division, PHE Dte. (SM/13747), Reference Id- 106636949, Application no- 1007864377 | BILL/00918/2024-2025 | 257 | 03/07/2024 | 0 | WBSEDCL | 5.55 | 0.00 | 0 | 0 | ||
| 6 | HOWRAH | Bagnan-I | Electrical | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Hijlak water supply scheme, T.W. No.- I & II, Block: Bagnan-I, District- Howrah under Electrical Division, PHE Dte. | Assistant Engineer Howrah mechanical Sub Division | Junior Engineer2 | ORD/000257/2022-2023 | 924/ED | 22/02/2023 | 922 | MENAKA ENTERPRISE | 20.27 | 0.00 | 0 | 40 |
| 7 | HOWRAH | Bagnan-I | Howrah Division | Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 | New | Work order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells & 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation including pile design & Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement at Head Work Site HIjlak PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. | AE/Ulu | je/blk/bagn1 | ORD/000105/2023-2024 | 2696/HD | 24/07/2023 | 1096 | PRADIP KUMAR JATI | 293.89 | 75.84 | 25.81 | 1 |
| Total | 401.71 | 113.91 | 28.36 | ||||||||||||||