Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 996.27 372.96 37.44  
1 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Indent of Material VCH/000953/2021-2022 BP-2021-22-402 14/03/2022 0 EXECUTIVE ENGINNER RESOURCES DIVISION 513.19 0.00 0 0
2 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Preparation of DPR for augmentation of existing piped water supply scheme of Nischintapur PWSS, Amta-II Block under Uluberia Sub-Division of Howrah Division PHE Dte. VCH/000827/2021-2022 BP-2021-22-366 28/02/2022 0 STEELCONC AND ASSOCIATES 3.86 0.00 0 0
3 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Work Order for Laying Distribution system, & FHTC (3145 nos) for Augmentation of Nischintapur PWSS under Amta-II Block under Uluberia Sub-Division under Howrah Division PHE Dte. AE/Ulu JE/USD ORD/000387/2021-2022 184/HD 31/01/2022 120 VISHAL CONSTRUCTION CO. 348.97 345.67 99.05 100
4 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Material Requisition To Resource Division RTOR000019/2021-2022 204/HD 01/02/2022 0 Resource Division 19.32 0.00 0 0
5 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Material Requisition To Resource Division RTOR000006/2022-2023 1222/HD 09/06/2022 0 Resource Division 6.21 0.00 0 0
6 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Work Order for Sinking of 1 (One) No. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Augmentation of Nischintapur PWSS of Amta-II Block of Uluberia Sub-Division under Howrah Division, P.H.E. Dte. AE/Ulu JE/USD ORD/000608/2022-2023 2724/HD 14/12/2022 30 DEV DAS SHAW 13.64 12.89 94.5 100
7 HOWRAH Electrical Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Nischintapur water supply scheme T.W. No. New, Block: Amta-II, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer5 ORD/000036/2023-2024 1713/ED 18/04/2023 90 PADMA ENGINEERING CO. 10.74 10.40 96.83 80
8 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Interconnection between 3rd TW with LDS for Augmentation of Nischintapur Piped Water Supply scheme in Amta-II Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu JE/USD ORD/000313/2024-2025 4858/HD 22/11/2024 20 DEV DAS SHAW 15.37 4.00 26.02 100
9 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Quotation money depostion for new service connection at Nischintapur Water Supply Scheme BILL/01743/2023-2024 BP-2023-24-775 29/03/2024 0 WBSEDCL 15.58 0.00 0 0
10 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Additional LDS work to reduce water scanty problem from 3rd TW to Ghoshpara at Mouza Sheoraberia of Nischintapur PWSS under Amta-II Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu JE/USD ORD/000114/2025-2026 3145/HD 15/07/2025 45 KALIDAS ENTERPRISE 21.67 0.00 0 80
11 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Supplying,fitting,fixing and erecting of Swajal Gram (Har Ghar Jal Village) Board at different PWSS of different schemes under Howrah Division P.H.E. Dte. (For, Amta-II Block) (PART-B) AE HQ ORD/000219/2025-2026 4117/HD 14/10/2025 30 ABONTICA ENTERPRISE 4.79 0.00 0 0
12 HOWRAH Howrah Division Augmentation of Nischintapur piped water supply scheme. , SM/09720 Augmentation Additional LDS work to reduce water scanty problem from 4th TW to Nischintapur at Mouza Nischintapur of Nischintapur PWSS under Amta-II Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000279/2025-2026 4413/HD 25/11/2025 45 A. R. CONSTRUCTION 22.93 0.00 0 0
Total 996.27 372.96 37.44