Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 781.69 241.89 30.94  
1 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Preparation of DPR for augmentation of existing piped water supply scheme of Kanupat PWSS, Udaynarayanpur Block Under Uluberia Sub-Division of Howrah Division PHE Dte. AE/RWS JE/RWS/Udaynaryanpur ORD/000250/2021-2022 2109/HD 24/11/2021 15 GEOTECHNICAL ENGINEERS CONSORTIUM 3.05 3.05 100 0
2 HOWRAH Central Drilling Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KANUPAT PWSS, UDAYNARAYANPUR BLOCK, HOWRAH DIST, UNDER CDD, PHE DTE. ORD/000261/2022-2023 307/CMSD-I 08/07/2022 15 INDIA ENTERPRISE 4.98 4.11 82.53 0
3 HOWRAH Central Drilling Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL BY DEPARTMENTAL RIG MACHINE AT KANUPAT PWSS, UDAYNARAYANPUR BLOCK, HOWRAH DISTRICT UNDER CDD, PHE DTE. ORD/000262/2022-2023 306/CMSD-I 08/07/2022 15 INDIA ENTERPRISE 3.89 3.74 96.14 0
4 HOWRAH Central Drilling Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation SUPPLY & DELIVERY OF CONSUMABLES AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBEWELL AT KANUPAT PWSS, UDAYNARAYANPUR BLOCK, HOWRAH DISTRICT UNDER CDD, PHE DTE. ORD/000263/2022-2023 308/CMSD-I 08/07/2022 15 INDIA ENTERPRISE 1.80 1.52 84.44 0
5 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Indent of Material VCH/000953/2021-2022 BP-2021-22-402 14/03/2022 0 EXECUTIVE ENGINNER RESOURCES DIVISION 513.19 0.00 0 0
6 HOWRAH Electrical Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Kanupat water supply scheme, T.W. No. II, Block: Udaynarayanpur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001125/2022-2023 1404/ED 22/03/2023 90 MAA KALI ENTERPRISE 8.27 8.07 97.58 0
7 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Material Requisition To Resource Division RTOR000020/2022-2023 1624/HD 05/08/2022 0 Resource Division 11.87 0.00 0 0
8 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Construction of approach road cum internal pathway at HW site of Kanupat PWSS Udaynarayanpur Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000157/2024-2025 4133/HD 23/09/2024 15 BISWAJIT BAG 6.64 0.00 0 0
9 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Work Order for Augmentation of Kanupat Water Supply scheme by laying distribution system, providing functional house hold tap connection (FHTC) work with geo tagging by using Jal Swapna app, construction of RCC elevated reservior of capacity 200 m3 of staging height 20 mtr including soil investigation under Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu JE/USD ORD/000130/2022-2023 1339/HD 27/06/2022 548 JAHANGIR ALAM 216.52 216.50 99.99 90
10 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Shifting and stacking of serviceable DI pipes and specials within the campus at Kanupat Store under Uluberia Sub-Division under Howrah Division, P.H.E. Dte. AE/Ulu JE/USD ORD/000152/2024-2025 737/AE/USD 30/08/2024 25 BISWAJIT BAG 2.43 0.64 26.34 100
11 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Display Board at different PWSS at Uluberia-II Udaynarayanpur Block under uluberia Sub-Division, under Howrah Division P.H.E. Dte. AE/Ulu JE/USD ORD/000643/2023-2024 3218/AE/USD 12/03/2024 30 ABONTICA ENTERPRISE 4.26 4.26 100 100
12 HOWRAH Howrah Division Augmentation of Ground water based PWSS Kanupat. , SM/09350 Augmentation Supplying,fitting,fixing and erecting of Swajal Gram (Har Ghar Jal Village) Board at different PWSS of different schemes under Howrah Division P.H.E. Dte. (For, Udaynarayanpur Block) (PART-A) AE HQ ORD/000225/2025-2026 4123/HD 14/10/2025 30 JHARNA ENTERPRISE 4.79 0.00 0 0
Total 781.68 241.89 30.95