Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 32,269.59 0.53 0  
1 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Design, Surveying,Engineering, Supplying and Construction, Erection, Installation, Testing,Commissioning, of Fixed type Intake Jetty with Pump house, Construction of Sub-station; Raw Water Raising Main Bank Protection, 40 MLD (Minimum) capacity Water Treatment Plant (WTP) based on conventional technologies + 20% overloading; Clear Water Pumping Mains, Booster Stations (11 numbers) at Arsha, Baghmundi, Balarampur, Bandwan, Manbazar I (part), Manbazar II & Purulia I (Part) Blocks including pumping machineries on EPC/ Turnkey basis in a single package including 3 (three) months Trial Run and Operation & Maintenance for 3 years for Surface Based W/S scheme for Southern Sector under Purulia Distric. Assistant Engineer Junior Engineer,Junior Engineer-1,Junior Engineer-3 ORD/001820/2023-2024 53/PD 09/01/2024 821 WPIL LIMITED 32,180.00 0.00 0 15
2 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Hiring of maxi cab (non air conditioned) Bharat Stage-III Diesel/LPG/CNG driver engine including driver for official use of the Executive Engineer, Purulia Mechanical Division PHE, Dte. (01/10/24 to 31/03/25) JUNIOR ENGINEER ORD/000615/2024-2025 400/PMSD(W/S) 23/09/2024 182 TAPAN KUMAR DEY 0.86 0.53 61.63 0
3 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Continuation work order for Hiring of Euro-4 Diesel car of Ambassador Bharat stage-IV/ TATA indigo eCS Bharat Stage-IV/ Swift tour Bharat stage-IV or as similar model for the official uses under Purulia Division, PHE Dte. (w.e.f.01.09.2023 to 31.08.2024.) Assistant Engineer Junior Engineer ORD/004200/2023-2024 477/A/PR 31/08/2023 366 ANUP KUMAR SAHA 1.76 0.00 0 0
4 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Continuation Work Order for: "Hiring of maxi cab (non air conditioned) Bharat Stage-III Diesel/LPG/CNG driver engine including driver for official use of the Executive Engineer, Purulia Mechanical Division PHE, Dte. (w.e.f - 01/04/25 to 29/09/25)" ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001007/2024-2025 94/PMSD(W/S) 13/03/2025 182 TAPAN KUMAR DEY 0.86 0.00 0 50
5 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Construction of Scada Room and Chlorine Room at Bandwan (Zone - I, V & VI) Of Purulia Pipe Water Supply Scheme(Southern Sector) within Purulia District under Purulia Division, PHE Dte. ORD/000222/2025-2026 1087/PD 17/06/2025 120 RAKSHIT ENTERPRISE 43.05 0.00 0 0
6 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar-I,Manbazar-II,Purulia-I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR (PHASE I) , SM/18333 New Construction of Scada Room and Chlorine Room at Balarampur (Zone - III, IV & V) Of Purulia Pipe Water Supply Scheme(Southern Sector) within Purulia District under Purulia Division, PHE Dte. ORD/000221/2025-2026 1086/PD 17/06/2025 120 RANI SATI CONSTRUCTION 43.06 0.00 0 0
Total 32,269.60 0.53 0