Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 915.1 598.64 65.42  
1 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Water supply Tap Connection Arrangement for 40 nos School upto 200 Students, within Manbazar-I Block (Part-B) of Purulia District under Purulia Division, PHE Dte. (Tender No.17/SE/PMU of 2022-23) VCH/001029/2022-2023 BP-2022-23-328 29/09/2022 EQUIPMENTS AND SPARES AGENCIES 75.73 0.00 0 0
2 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Water supply Tap Connection Arrangement for 30 nos School upto 200 Students, within Manbazar-I Block (Part-C) and 16 nos School upto 200 Students, within Neturia Block (Part-B) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer ORD/000098/2022-2023 677/PD 25/04/2022 45 BINGAS ELECTRICAL ELECTRONICS AND SOLAR SYSTEM 193.98 150.53 77.6 0
3 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Water supply Tap Connection Arrangement for 49 nos School upto 200 Students, 4 nos School for 201-500 Students, 1 no School for 501-800 Students and 1 no School above 800 Students within Neturia Block (Part-A) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000015/2022-2023 566/PD 08/04/2022 45 MS D.PALIT AND CO. 232.21 210.59 90.69 100
4 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Water supply Tap Connection Arrangement for 46 nos School upto 200 Students, 7 nos School for 201-500 Students, 1 no School for 501-800 Students and 1 no School above 800 Students within Manbazar-I Block (Part-A) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER ORD/000551/2022-2023 676/PD 25/04/2022 45 EQUIPMENTS AND SPARES AGENCIES 232.07 179.12 77.18 100
5 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Water supply Tap Connection Arrangement for 40 nos School upto 200 Students, within Manbazar-I Block (Part-B) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER ORD/000089/2022-2023 674/PD 25/04/2022 45 EQUIPMENTS AND SPARES AGENCIES 168.51 53.85 31.96 100
6 PURULIA Purulia Division Water supply Tap Connection Arrangement to Schools 196 nos. under Manbazar I & Neturia Block In Purulia District under Purulia Division, PHE.Dte. , SM/10229 School Repairing of Boundary walls, Supplying and fitting of Mark -II Hand Pump along with concrete platform at the low yield Big Dia DTH Tubewell or Construction of concrete cover at the dry big dia DTH Tubewellssinked at various Schools & AWCs of . Puncha&Manbazar-I Blocks under Purulia Division ,PHE,Dte. Assistant Engineer Junior Engineer ORD/001383/2023-2024 1738/PD 04/12/2023 30 ESSAR CONSTRUCTION 12.60 4.55 36.11 70
Total 915.10 598.65 65.42