Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 846.58 533.28 62.99  
1 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School FHTC Connetion for School Bundwan W/s Scheme. VCH/000290/2022-2023 null 18/07/2022 MAHAVIR PUMPS MANUFACTURING PVT. LTD. 60.00 0.00 0 0
2 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School Water supply Tap Connection Arrangement for 47 nos School upto 200 Students, 4 nos School for 201-500 Students, 1 no School for 501-800 Students and 1 no School above 800 Students within Arsha Block (Part-A) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer ORD/000088/2022-2023 672/PD 25/04/2022 45 ANUP KUMAR SAHA 218.38 217.39 99.55 0
3 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School Hiring of Euro-4 Diesel can of Ambassador Bharat stage-IV/TATA Indigo e.c.s Bharat Stage-IV/Swift tour Bharat stage -II/BS-III purchased on or after 01.05.2005 with Diesel/LPG/CNG Engine ( Maxi Cab, non-Airconditioned) for site visit of JJM work of 20 Nos. Blocks within Purulia District under RWS purulia Sub Division under Purulia Division PHE Dte. (Part-C) Assistant Engineer ORD/001720/2023-2024 430-B/PR 01/08/2023 195 SUMIT KUMAR CHAKRABORTY 0.96 0.00 0 0
4 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School Water supply Tap Connection Arrangement for 47 nos School upto 200 Students, 5 nos School for 201-500 Students, 1 no School for 501-800 Students and 1 no School above 800 Students within Bandwan Block (Part-A) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000463/2021-2022 436/PD 21/03/2022 45 MAHAVIR PUMPS MANUFACTURING PVT. LTD. 227.94 153.95 67.54 75
5 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School Water supply Tap Connection Arrangement for 43 nos School upto 200 Students, within Bandwan Block (Part-B) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000216/2022-2023 771/PD 02/05/2022 45 PREMNATH MITRA 181.33 137.31 75.72 84
6 PURULIA Purulia Division Water supply tap connection arrangement to Schools 186 nos. under Bandwan & Arsha Block in Purulia District in Purulia Disision. , SM/10226 School Water supply Tap Connection Arrangement for 20 nos. AWC within Jhalda-I, Arsha & Bandwan Block (Part-C) of Purulia District under Purulia Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER ORD/001329/2022-2023 1050_PD 08/07/2022 45 PRASENJIT BASAK 157.97 24.63 15.59 100
Total 846.57 533.29 62.99