Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 22,128.89 46.47 0.21  
1 NORTH 24 PARGANAS Barasat-II Eastern Mechanical KOLA Piped Water Supply Scheme , SM/18591 New Providing And Installation of Electro-Mechanical Equipments and Allied Works for Arsenic Removal Plant (Headworks Site) at Kola Piped Water SupplyScheme, Block: Barasat-II, Dist. North 24 Pgs under EMD, PHE Dte. ORD/001266/2023-2024 4934/EMD 18/08/2023 30 WESTERN ENGINEERING CO. 52.69 0.00 0 0
2 NORTH 24 PARGANAS Barasat-II Barasat Arsenic Division KOLA Piped Water Supply Scheme , SM/18591 New Laying of Distribution System including specials all complete and Providing Functional House Hold Tap Connection (FHTC) from distribution system within command area, construction of 2 nos. pump house & construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir & soil test as per Departmental design, drawing and specification including bored pile & pile cap at KOLA water supply scheme, Barasat-II block under Barasat Arsenic Division, P.H.E. Dte Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000093/2023-2024 1937/B.Ar.D. 14/08/2023 366 MONDAL ENTERPRISE 639.02 0.00 0 0
3 NORTH 24 PARGANAS Barasat-II Barasat Arsenic Division KOLA Piped Water Supply Scheme , SM/18591 New Survey, Design Drawing & DPR Preparation for KOLA Water Supply Scheme (NEW PWSS) in BARASAT-II BLOCK under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000124/2023-2024 1836/B.Ar.D. 01/08/2023 30 TIYAS CONSULTANCY AND INFRASTRUCTURE PRIVATE LIMITED 11.36 11.36 100 100
4 NORTH 24 PARGANAS Barasat-II Eastern Mechanical KOLA Piped Water Supply Scheme , SM/18591 New Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Zone-I) under Ghatpatila W/S Scheme, Kola W/S Scheme (P/H-I &II) & Malidah W/S Scheme (P/H-I & II) District of 24 Pgs. (N). NIET No. 24 of EE/EMD of 2022-23 (Sl. No.- 08) ORD/002530/2023-2024 35EMD 23/08/2023 30 SUNRISE ENGINEERING CORPORATION 65.84 35.11 53.33 80
5 NORTH 24 PARGANAS Barasat-II Barasat Arsenic Division KOLA Piped Water Supply Scheme , SM/18591 New Material Requisition To Resource Division RTOR000004/2023-2024 68/B.Ar.D 10/01/2024 0 Resource Division 20.22 0.00 0 0
6 NORTH 24 PARGANAS Barasat-II Central Drilling KOLA Piped Water Supply Scheme , SM/18591 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 22,128.89 46.46 0.21