Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 99.77 118.64 118.91  
1 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Tildanga & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07712 Retrofitting Providing Functional House Hold Tap Connection and allied works at Dakshindiara, Chak Khamarpur, Shrikati, Jagannathpur and Mahespur Mouzas of Baduria Block from Tildanga Ground Water Supply Scheme under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000217/2020-2021 562/B.Ar.D. 26/02/2021 90 SANJUKTA ENGINEERS 82.47 101.42 122.98 1
2 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Tildanga & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07712 Retrofitting Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Magurati Srirampur, Tildanga & its adjoining mouza Water Supply Scheme in Baduria Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000031/2021-2022 1445/B.Ar.D 31/08/2021 15 SIRCON ENGINEERING SERVICES 4.06 4.06 100 1
3 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Tildanga & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07712 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Asraf Ali at Srikati Sesher para under Tildanga W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000263/2021-2022 473/B.Ar.D 16/03/2022 15 G. S. CONSTRUCTION & CO. 4.45 4.44 99.78 1
4 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Tildanga & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07712 Retrofitting Road restoration due to laying of UPVC/HDPE Pipe line for providing FHTC of Tildanga Water Supply Scheme under Baduria Block under Barasat Arsenic Division, PHE Dte. (SM/07712) (Sl No. 1) Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000138/2022-2023 2086/B.Ar.D. 28/10/2022 15 BALAJEE ENTERPRISES 3.95 3.94 99.75 1
5 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Tildanga & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07712 Retrofitting Withdrawal and Relaying of 160 mm dia. HDPE rising main pipeline along with protection work and other allied works near 2nd Pump House under Tildanga W/S Scheme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000029/2023-2024 1168/B.Ar.D. 16/05/2023 30 M/S DATTA ENTERPRISE 4.84 4.78 98.76 100
Total 99.76 118.63 118.92