Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 106.03 35.7 33.67  
1 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Bahira & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07708 Retrofitting Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Bahira & its adjoining mouza water supply scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000060/2021-2022 1692/B.Ar.D 30/09/2021 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.62 4.62 100 1
2 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Bahira & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07708 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Fanindra Nath Karmakar and Kena Ghosh at Baghyabantapur under Bahira W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000266/2021-2022 476/B.Ar.D 16/03/2022 15 SAHA ENTERPRISE 4.73 4.72 99.79 1
3 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Bahira & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07708 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Aribulla at Pagdha Dakshinpara under Bahira W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000274/2021-2022 480/B.Ar.D 16/03/2022 15 DIPA CHHETRI 4.59 4.59 100 1
4 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Bahira & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07708 Retrofitting Providing Functional House Hold Tap Connection and allied works at Chakaminpur, Pakdaha and Balipur Mouzas of Barasat- II Block from Bahira Ground Water Supply Scheme Under "Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000126/2020-2021 135/B.Ar.D. 21/01/2021 90 BANI ENGINEERING CO 87.16 16.85 19.33 100
5 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Bahira & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07708 Retrofitting Laying of UPVC Pipe Line at damaged portion of distribution network near Dadpur Gabtala Market of Bahira water supply scheme at Barasat-II Block due to construction of culvert and Drain under Barasat Arsenic Division, PHE Dte. under 'JAL JIBAN MISSION' Programme. (SM/07708) (Sl No. 3) Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000140/2022-2023 2088/B.Ar.D. 28/10/2022 21 M/S DATTA ENTERPRISE 4.93 4.92 99.8 1
Total 106.03 35.71 33.68