Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 119 104.49 87.81  
1 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Puturia & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07707 Retrofitting Route survey, Distribution designe & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Puturia & its adjoining mouza Water Supply Scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000039/2021-2022 1563/B.Ar.D. 15/09/2021 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 6.19 6.19 100 1
2 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Puturia & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07707 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Jiyawal at Bokanda Majher Para under Puturia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000265/2021-2022 475/B.Ar.D 16/03/2022 15 CHAKRABORTY SUPPLIERS & CONSTRUCTION 4.68 4.67 99.79 1
3 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Puturia & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07707 Retrofitting Providing Functional House Hold Tap Connection and allied works at Simulgachhi, Bonkanda and Baidyapur Mouzas of Barasat- II Block from Puturia Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000123/2020-2021 127/B.Ar.D. 20/01/2021 90 BANI ENGINEERING CO 94.63 80.52 85.09 100
4 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Puturia & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07707 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near Najrul house and Hafijul house at Simulgachi under Puturia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000275/2021-2022 481/B.Ar.D 16/03/2022 15 M/S.KRISHNA MONDAL 4.79 4.79 100 70
5 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Puturia & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07707 Retrofitting Repair & Renovation of Iron Elimination Plant of 161 M3 including Media Change of Puturia Water Supply Scheme under Barasat- II Block Under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000027/2023-2024 1165/B.Ar.D. 16/05/2023 30 GHOSH CONSTRUCTION 8.71 8.32 95.52 100
Total 119.00 104.49 87.81