Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9 | 1,235.35 | 205.58 | 16.64 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Formal work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2,3,4 (Size-3.60x3.00 mtr),Laying of DI rising main and DI/UPVC distribution pipe line,Providing Functional Household Tap Connection,Protection works for different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile at different places,Construction of 450 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Dakshin Akhratala water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/001208/2023-2024 | 4047/BD | 13/10/2023 | 365 | M/S DATTA ENTERPRISE. | 753.32 | 191.10 | 25.37 | 80 |
2 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Acceptance cum work order for sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Dakshin Akhratala w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | ORD/000892/2024-2025 | 3376/BD | 02/12/2024 | 30 | M/S K.P.PAL. | 25.88 | 0.00 | 0 | 0 | |
3 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Formal work order for Sinking of 4 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1,2,3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Dakshin Akhratala w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | ORD/000811/2024-2025 | 3306/BD | 26/11/2024 | 60 | UTPAL CONSTRUCTION & CO. | 103.47 | 0.00 | 0 | 0 | |
4 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Route Survey, Design Drawing & Preparation of DPR for Kalupur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/001315/2021-2022 | 122/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.80 | 0.00 | 0 | 1 |
5 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) | Assistant Engineer | ORD/002738/2021-2022 | 314/HSD | 15/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.83 | 4.83 | 100 | 100 | |
6 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) | Assistant Engineer | ORD/002739/2021-2022 | 315/HSD | 15/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.82 | 4.82 | 100 | 100 | |
7 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-C) | Assistant Engineer | ORD/002740/2021-2022 | 336/HSD | 21/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.83 | 4.83 | 100 | 100 | |
8 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Material Requisition To Resource Division | RTOR000226/2022-2023 | 872/BD | 22/03/2023 | Resource Division | 296.35 | 0.00 | 0 | 0 | |||
9 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Dakshin Akhratala Piped Water Supply Scheme , SM/18617 | New | Material Requisition To Resource Division | RTOR000008/2024-2025 | 3442/BD | 06/12/2024 | Resource Division | 38.05 | 0.00 | 0 | 0 | |||
Total | 1,235.34 | 205.58 | 16.64 |