Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 1,140.09 108.63 9.53  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Hiring 1 (one) no. Diesel Luxary Car on daily basis (for 01.09.2024 to 28.02.2025) for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. Junior Engineer ORD/001179/2024-2025 1121/BST 30/08/2024 181 DEBAPRASAD MONDAL. 0.86 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Formal work order for Construction of 700cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing FHTC for Augmentation of Berachampa Zone-I water supply Scheme under Barasat Sub-Division PHE Dte. Assistant Engineer Junior Engineer ORD/000759/2023-2024 2552/BD 24/08/2023 360 MONDAL ENTERPRISE. (BARASAT) 777.60 95.71 12.31 24
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Acceptance cum work order for Renovation of Iron Elimination Plant at Berachampa Zone-I Water Supply Scheme within Deganga Block under Barasat Sub Division, P.H.E.Dte. Assistant Engineer ORD/001154/2024-2025 99/BD 09/01/2025 40 JAGANNATH CONSTRUCTION. 9.19 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Acceptance cum work order for Construction of Boundary Wall in Hosenpur Mouza Water Supply Scheme at Berachampa Zone - I within Deganga Block under Barasat Sub-Division, PHE Dte. Assistant Engineer ORD/001043/2024-2025 56/BD 07/01/2025 30 JIT CONSTRUCTION 27.29 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Acceptance cum work order for Additional Laying of HDPE pipe line and allied work in connection with Augmentation Berachampa Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. Assistant Engineer ORD/001049/2024-2025 54/BD 07/01/2025 30 MONDAL ENTERPRISE. (BARASAT) 36.88 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000605/2022-2023 658/BSD 18/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.86 3.86 100 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Acceptance cum work order for Sinking of 1 no. 300mm. X 200mm.dia. 190.00mtr. deep tube well by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long filter for Augmentation of Berachampa Zone-I Water Supply Scheme at 2nd Tube well Site under Barasat Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000281/2024-2025 2192/BD 05/08/2024 30 M/S K.P.PAL. 13.30 0.00 0 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C Assistant Engineer Junior Engineer ORD/001843/2023-2024 1119./BSD 09/02/2024 4 S.M.TRADERS. 0.88 0.44 50 100
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 185 mtr deep Tube well by D.R. Rig method having 300 mm dia 42.0 mtr. long PVC housing pipe & 200 mm dia 30.0 mtr. long filter for Augmentation Berachampa Zone-I Water Supply Scheme (Head Work Site) of Barasat Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001925/2023-2024 802/BD 15/03/2024 30 ACME CONSTRUCTION 13.08 6.19 47.32 80
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Construction of Pump House with latrine at Berachampa Zone-I water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. Junior Engineer ORD/002151/2023-2024 1242/BSD 15/03/2024 30 ROMI TREDERS. 4.86 2.43 50 100
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Material Requisition To Resource Division RTOR000040/2023-2024 1284/BD 25/04/2023 Resource Division 211.19 0.00 0 0
12 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Material Requisition To Resource Division RTOR000103/2023-2024 3093/BD 10/10/2023 Resource Division 24.61 0.00 0 0
13 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation Material Requisition To Resource Division RTOR000130/2023-2024 4374/BD 10/11/2023 Resource Division 9.49 0.00 0 0
14 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation New service connection at P.H.No- I ,Zone-I of Berachampa water supply scheme under EMSD-I ,PHE Dte .in 24Pgs(N). BILL/04807/2023-2024 BP-306-23-24 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.50 0.00 0 null
15 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Berachampa Zone-1 Piped Water Supply Scheme , SM/14490 Augmentation New service connection at P.H.No- I ,Zone-I of Berachampa water supply scheme under EMSD-I ,PHE Dte .in 24Pgs(N). BILL/04807/2023-2024 BP-306-23-24 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.50 0.00 0 null
Total 1,140.08 108.63 9.53