Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 215.17 108.55 50.45  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Material Requisition To Resource Division RTOR000035/2023-2024 1274/BD 25/04/2023 0 Resource Division 23.58 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Material Requisition To Resource Division RTOR000077/2023-2024 1675/BD 06/06/2023 0 Resource Division 7.07 0.00 0 0
3 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electrio-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II under Donnagar W/S Scheme District of 24 Pgs. (N). Assistant Engineer Junior Engineer ORD/001146/2023-2024 4749/EMD 07/08/2023 30 BARISAL TRADING CO. 20.19 17.05 84.45 85
4 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Acceptance cum work order for Sinking of 250mm. X 150mm.dia. 300.00mtr. deep tubewell by direct rotary rig method, having 250mm.dia. 30.0mtr. long PVC housing pipe & 150mm.dia. 30.0mtr. long pre-packed resin bonded filter at Head Work Site of Donnagar Water Supply Scheme under Barasat Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000830/2022-2023 523/BD 20/02/2023 15 M/S SUKANTA ENTERPRISE. 14.69 12.12 82.51 32
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Preparation of DPR in connection of augumentation of Donnagar Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-15 Assistant Engineer Junior Engineer ORD/000308/2022-2023 562/BSD 29/06/2022 30 RADIANT 2.60 2.46 94.62 100
6 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Donnagar PWSS to Accommodate FHTC. , SM/14127 Augmentation Formal work order for Laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Donnagar Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000092/2023-2024 1531/BD 19/05/2023 681 M/S S. & P CONSTRUCTION 147.04 76.92 52.31 20
Total 215.16 108.55 50.45