Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 22,088.16 356.87 1.62  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 1 No. Pump House (P.H. No-IV) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002945/2021-2022 832/BSD 16/12/2021 30 ROMI TREDERS. 1.25 1.18 94.4 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002954/2021-2022 830/BSD 16/12/2021 30 P.ENTERPRISE. 1.85 1.75 94.59 1
3 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 02 Nos. Pump House (P.H. No.-II & III) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002953/2021-2022 831/BSD 16/12/2021 30 KABASI ENTERPRISE. 2.51 2.39 95.22 1
4 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000606/2022-2023 659/BSD 18/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.58 99.17 1
5 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Material Requisition To Resource Division RTOR000104/2023-2024 3087/BD 10/10/2023 0 Resource Division 18.46 0.00 0 0
6 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Material Requisition To Resource Division RTOR000041/2023-2024 1269/BD 25/04/2023 0 Resource Division 32.07 0.00 0 0
7 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-D Assistant Engineer Junior Engineer ORD/001844/2023-2024 1119/1/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.88 100 100
8 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Amdanga & Deganga) in North 24 Parganas under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000247/2024-2025 172/BSD 10/06/2024 7 IMAGIN 0.98 0.98 100 100
9 NORTH 24 PARGANAS Central Drilling Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
10 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000564/2023-2024 2447/BD 16/08/2023 959 H.I.ENTERPRISE. 556.61 346.11 62.18 78
11 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electrio-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Zone-I, II and IV) under Berachampa W/S Scheme District of 24 Pgs. (N). NIET No. 24 of EE/EMD of 2022-23 (Sl. No.- 02) Assistant Engineer Junior Engineer ORD/000823/2022-2023 30/EMDdt.03.01.2023 10/02/2023 872 M/S P.P. ELECTRICALS 78.21 0.00 0 66
12 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Acceptance cum work order for Renovation of Iron Elimination Plant at Berachampa Zone-II Water Supply Scheme within Deganga Block under Barasat Sub Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/001155/2024-2025 615/BD 27/02/2025 40 ANJALI ENTERPRISE. 9.21 0.00 0 0
13 NORTH 24 PARGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Acceptance cum work order for Sinking of 3 nos 300mm. X 200mm.dia. 200.00mtr. deep tube well by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long UPVC Medium Well Screen (RMS) Pipes with Ribs at Berachampa Zone-II( H/W site & 2nd T/W site) & Berachampa Zone-III( 2nd T/W site) Water Supply Scheme under Barasat Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001503/2024-2025 646/BD 28/02/2025 60 JOY GURU ENTERPRISE 42.76 0.00 0 0
Total 22,088.16 356.88 1.62