Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 245.44 0 0  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Durgapur Baylani Zone-I to accommodate FHTC , SM/12275 Augmentation Material Requisition To Resource Division RTOR000249/2022-2023 933/BD 22/03/2023 0 Resource Division 120.60 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Durgapur Baylani Zone-I to accommodate FHTC , SM/12275 Augmentation Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion with protection work in connection with Augmentation of Durgapur Baylani water supply scheme (Z-I & II), Hingalganj Block of Hasnabad Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000100/2024-2025 2401/BD 22/08/2024 360 M/S S.C. CIVIL ENTERPRISES 116.00 0.00 0 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Durgapur Baylani Zone-I to accommodate FHTC , SM/12275 Augmentation Acceptance cum work order for Land development at OHR site in connection with augmentation of Durgapur Baylani w/s scheme (Z-I), Hingalganj under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000255/2025-2026 2334/BD 07/07/2025 60 BABUSONA CONSTRUCTION. 7.13 0.00 0 0
4 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Durgapur Baylani Zone-I to accommodate FHTC , SM/12275 Augmentation Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Durgapur Baylani Z-I w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte.Part-C Assistant Engineer Junior Engineer ORD/001467/2024-2025 342/HSD 06/02/2025 10 M/S RAJPATH CONSTRUCTION. 0.85 0.00 0 100
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Durgapur Baylani Zone-I to accommodate FHTC , SM/12275 Augmentation Acceptance cum work order for Laying of 140 mm(Near Asharia Paschim) ,180 mm(Near OHR) dia UPVC distribution pipe line in connection with Augmentation of Durgapur Baylani water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001534/2024-2025 389/HSD 10/02/2025 10 M/S K.B.ENTERPRISE. 0.86 0.00 0 100
Total 245.44 0.00 0