Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 2,390.68 387.66 16.22  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Acceptance cum work order for Laying of 50 mm dia. UPVC pipe line for providing 3 nos. tap connection at near Sulkuni Abad area within Bhabanipur W/S Scheme, Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. Assistant Engineer ORD/000296/2023-2024 792/HSD 13/07/2023 7 M/S K.B.ENTERPRISE. 0.86 0.00 0 0
2 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II and III (Zone-II) (Rep.) under Bhawanipur W/S Scheme District of 24 Pgs. (N) ORD/001151/2023-2024 4754/EMD 07/08/2023 30 A.G ENTERPRISE. 41.41 0.00 0 0
3 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Zone-I) (New) under Bhawanipur W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001150/2023-2024 4753/EMD 07/08/2023 30 RMD TRADING 27.98 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Bhabanipur water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000784/2023-2024 2600/BD 28/08/2023 360 M/S S.S.ENTERPRISE. (SOUTH) 956.10 249.85 26.13 70
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, construction of 400cum capacity 20mtr staging height R.C.C Over head Reservoir as per Dept. design, drawing & specification including bored pile with pile cap and providing Functional Household Tap connection in connection with Augmentation of Bhabanipur Water Supply Scheme(Zone-I), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division PHE Dte. Assistant Engineer Junior Engineer ORD/000852/2023-2024 2651/BD 01/09/2023 360 SUPRITI ENTERPRISE. 867.51 108.15 12.47 45
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bhabanipur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/002031/2023-2024 931/BD 15/03/2024 45 AAHAN CONSTRUCTION 59.17 0.00 0 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method at PH No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bhabanipur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001933/2023-2024 916/BD 15/03/2024 60 M/S K.P.PAL. 89.28 29.66 33.22 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC , SM/12126 Augmentation Material Requisition To Resource Division RTOR000235/2022-2023 911/BD 22/03/2023 Resource Division 348.37 0.00 0 0
Total 2,390.68 387.66 16.22