Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 532.15 375.18 70.5  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Material Requisition To Resource Division RTOR000005/2023-2024 1240/BD 25/04/2023 0 Resource Division 13.72 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gadpukuria (Zone-I) Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001152/2023-2024 2926/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.12 13.81 85.67 100
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Acceptance cum work order for Renovation of 103 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001542/2023-2024 13/BD 02/01/2024 365 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 77.74 70.84 91.12 100
4 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Acceptance cum work order for Construction of Boundary wall at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply scheme, Bagdah Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001472/2023-2024 4411/BD 10/11/2023 60 GHOSH CONSTRUCTION. 19.46 19.43 99.85 100
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Gadpukuria (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001493/2023-2024 4462/BD 21/11/2023 23 A.D.ENTERPRISE. 11.48 11.45 99.74 100
6 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection (FHTC) for augmentation of Gadpukuria (Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte Assistant Engineer Junior Engineer ORD/000048/2023-2024 1396/BD 08/05/2023 899 M/S DIPAK ENTERPRISE 343.41 259.65 75.61 90
7 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at P.H. No.-II ,ZONE-I (Replacement TUBE WELL) under Gadpukuria ground water based w/s scheme under Block_ Bagdah Dist. - 24Pgs(N) under EMSD-I, PHE Dte. Assistant Engineer Junior Engineer ORD/000599/2024-2025 2534/EMD 28/10/2024 30 BIJAN ENTERPRISE 11.78 0.00 0 0
8 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at P.H. No.-I and II ,ZONE-II (NEW TUBE WELL) under Gadpukuria ground water based w/s scheme under Block_ Bagdah Dist. - 24Pgs(N) under EMSD-I, PHE Dte. Assistant Engineer Junior Engineer ORD/000600/2024-2025 2535/EMD 28/10/2024 124 JAGANNATH ENTERPRISE 23.56 0.00 0 95
9 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC , SM/11761 Augmentation Acceptance cum work order for Additional laying of UPVC pipe to connect every house hold FHTC with Augmentation work at Gadpukuria (Zone-I) W/S Scheme under Bagdah Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000022/2025-2026 1699/BD 23/05/2025 60 THE TOWER CONSTRUCTION 14.88 0.00 0 0
Total 532.14 375.20 70.51