Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 774.98 477.43 61.61  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Route Survey, Design Drawing & Preparation of DPR for Kalupur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002789/2021-2022 122/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.80 3.77 99.21 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Material Requisition To Resource Division RTOR000105/2022-2023 3685/BD 14/12/2022 0 Resource Division 117.82 0.00 0 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Material Requisition To Resource Division RTOR000091/2022-2023 3659/BD 13/12/2022 0 Resource Division 21.27 0.00 0 0
4 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II and III (Rep) under Shimulpur W/S Scheme and Pump House No-I and II (Rep.) under Ichapur W/S Scheme and Kalupur W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001170/2023-2024 4798/EMD 09/08/2023 30 ORIENTAL ENGINEERING CO. 91.05 24.26 26.64 80
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000350/2024-2025 2417/BD 23/08/2024 60 ROY CHOWDHURY CONSTRUCTION. 37.80 0.00 0 0
6 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kalupur Water Supply Scheme (H/W Site & 2nd T/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001111/2023-2024 2924/BD 26/09/2023 60 SAHA CONSTRUCTION & CO 32.29 25.26 78.23 100
7 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Acceptance cum work order for Construction of Boundary wall at 1st Tube well site for Augmentation of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001744/2023-2024 560/BD 22/02/2024 45 MA CONSTRUCTION. 9.33 9.31 99.79 100
8 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and Construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001751/2023-2024 562/BD 22/02/2024 45 RAJ ENTERPRISE. 7.53 7.52 99.87 100
9 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC , SM/11631 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kalupur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000954/2022-2023 93/BD 11/01/2023 900 M/S S.S.ENTERPRISE. (SOUTH) 454.09 407.31 89.7 90
Total 774.98 477.42 61.6